Carbon Dioxide Emission Accounting and Reporting Requirements for Refractory Enterprises (2021-1773T-JC), Technical Specification for Project-based Carbon Dioxide Emission Reduction Assessment Cement Kiln Flue Gas Carbon Capture Project (2021-1775T-JC), Product Carbon Footprint Product Category Rules Wall Materials (2021-1781T-JC), Technical Specification for Carbon Emission Verification of Flat Glass Manufacturing (2021-1784T-JC) , Technical Specification for Evaluation of Low Carbon Products – General Portland Cement (2021-1794T-JC), Carbon Emission Limit per Unit Product of Glass Fiber (2021-1795T-JC), Carbon Emission Limit per Unit Product of Rock Wool, Slag Wool and Their Products (2021-1796T-JC), "Carbon Emission Limit for Unit Products of Wall Materials" (2021-1798T-JC) and "Technical Specification for Recycling of Waste Fiber Composites" (2021-0554T-JC) have been completed, according to the "Interim Measures for the Revision and Management of Building Materials Industry Standards" (No.188, 2012). It is now publicized and the deadline is April 27, 2023.
If you have different opinions on the nine industry standards (draft for comments), please fill in the Reply Form of Industry Standard Draft for Comments during the publicity period and send it to the mailbox of the Standard Quality Department of China Building Materials Federation, and copy it to the mailbox of the corresponding standard drafting unit. The subject of the mail should be marked with "standard name + building materials industry standard publicity feedback".