On July 6, the Planning and Natural Resources Bureau of Nanchuan District of Chongqing announced that the mining right of limestone for building stones in Gaoqiao Village, Dongcheng Street, Nanchuan District of Chongqing would be sold for 18.7 years at a starting price of 67.834 million yuan. The mining area of the
project is 0.1848 square kilometers, and the controlled resources of limestone for building stones within the planned mining area are 25258 thousand tons. Among them, the available resources are 18747 thousand tons, and the permanent slope resources are 6511 thousand tons; according to the average comprehensive recovery rate of 95% over the years, the recoverable reserves are 17810 thousand tons, and the production capacity is adjusted to 950,000 tons per year according to the mine. Starting and ending time of
application: July 6, 2023-August 2, 2023
Listing time: July 6, 2023-August 16
, 2023 According to the Digital Building Materials DataBM. Com, Nanchuan District is located in the southeast of the central urban area of Chongqing. It is one of the "pioneer areas for the integration development of the main metropolitan area". It borders Guizhou Province in the southeast, Wulong District in the northeast, Fuling District in the north, Banan District and Qijiang District in the west. It is an important transfer hub for Chongqing to open to the outside world in the south. In terms of
mineral resources, the distribution of mineral resources in Nanchuan District is relatively concentrated. Energy minerals such as coal, metal minerals such as bauxite, non-metallic minerals such as limestone and sandstone are mainly distributed in the central narrow strip of Nanchuan.
The General Plan of Mineral Resources in Nanchuan District of Chongqing (2021-2025) shows that by 2025, the reserves of major non-metallic mineral resources in Nanchuan District will be further increased, with 5 million tons of limestone resources for flux, 5 million cubic meters of limestone for decoration and 1000 cubic meters of geothermal resources per day. Appropriate control of the number of sand, stone and soil mining rights, the total number of mines in the region does not exceed 42, the proportion of large and medium-sized mines reached 60%.
Focus on the exploitation of shale gas, bauxite, geothermal and limestone minerals. By 2025, 50 blocks are planned to be exploited, of which 23 are planned to be newly established (including 8 for exploration and mining), namely, 1 limestone for making ash, 1 limestone for cement, 7 limestone for building stone, 3 limestone for decoration, 1 sandstone for glass, 5 sandstone for building, 2 shale for brick and tile, 2 geothermal and 1 mineral water. Adjust 15, namely 1 limestone for cement, 2 limestone for flux, 1 dolomite for metallurgy, 1 quartzite for glass, 1 sandstone for glass, 6 limestone for building stone, 2 sandstone for building, and 1 shale for brick and tile. 12 are reserved, including 2 bauxite, 1 limestone for making ash, 1 limestone for flux, 4 limestone for building stone, 3 shale for brick and tile, and 1 geothermal.