The first production line has achieved a total of tons of clinker 1095403 in the year.

2023-07-03 15:44:51

The project has overfulfilled the annual production task for five consecutive years.

Recently, according to the statistics of Nigeria SOKOTO Second-line Production and Operation Project, in the fifth year of its operation, the kiln was shut down for 22 days due to the owner's reasons, and a total of 1,095,403 tons of clinker were completed in the year. The annual output of clinker far exceeded the designed annual output of the production line, and was awarded a bonus for overproduction. The project has overfulfilled the annual production task for five consecutive years.   

Since its operation in 2018, with the strong support of the company's leaders and departments, SOKOTO has scientifically allocated the number of Chinese personnel to control costs, flattened its management structure to improve efficiency, continuously carried out technical transformation and optimization of the production line, and adopted preventive repair instead of preventive repair. Measures such as integration of patrol inspection and maintenance ensure the operation rate of the production line. All the operation staff overcame the local harsh environment of high temperature, sand dust and frequent Malaria, and worked hard in a down-to-earth manner, so that the second production line of SOKOTO exceeded the design capacity of the production line for five consecutive years, the clinker output was 5.555 million tons in five years, the bonus for overproduction was more than one million dollars, including the service life of kiln bricks, the operation rate of rotary kiln and other indicators reached the world's first-class level.   

Adhering to the win-win principle, facing the reality of the owner's lack of oil and gas, through continuous optimization of the proportioning and calcination scheme, on the premise of ensuring safety and production quality, the proportion of local inferior coal will be increased to 98%, energy saving and consumption reduction will continue to create more economic benefits for the owner, and at the same time, it will greatly reduce the interruption of production due to lack of oil and gas. It has won the owner's sincere recognition of Sinoma's construction and operation technology and organizational ability with its strength, and further consolidated the confidence of long-term cooperation between the two sides.   

Nigeria SOKOTO operation project will not stop at the immediate achievements, the production and operation team will take this as a new starting point, continue to expand and strengthen the project production and operation business, continue to strive to combine the actual situation on site, reduce costs, improve profitability, build brand and benchmark for the company with excellent performance and good reputation, and be down-to-earth. Continuously expand the company's overseas production and operation market.    On July 6-7,

2023, China Cement Network will hold the "2023 China Cement Energy Conservation and New Energy Development Conference" in Chongqing. China Building Materials, Conch Group, Jinyu Jidong, Red Lion Group, Huaxin Cement, Huarun Cement, Taiwan Cement, Shanshui Group, Tianrui Cement , Asian Cement and other leading enterprises will gather in Chongqing. Together with technical specialist of the industry and professors of colleges and universities, we will explore new ways of energy saving and carbon reduction in the cement industry to help the cement industry move towards a new journey of low-carbon and high-quality development.

All can be viewed after purchase
Correlation

The project has overfulfilled the annual production task for five consecutive years.

2023-07-03 15:44:51

On September 22, Shao Jun, Chairman of China Cement Network, visited Zibo Luzhong Refractories Co., Ltd. and was warmly received by Feng Jisheng, Chairman of the company.