Digital building materials DataBM. Com February 24 news, Jiangsu Dongtai Zhongbo Special Glass Co., Ltd. According to the data, the production line was put into cold repair on January 28, 2022 and put into operation on January 31, 2023.
Jiangsu Float Glass Production Line Dynamics on February 24 (Leader)
Digital building materials DataBM. Com February 24 news, Jiangsu Dongtai Zhongbo Special Glass Co., Ltd. According to the data, the production line was put into cold repair on January 28, 2022 and put into operation on January 31, 2023.
Jiangsu Float Glass Production Line Dynamics on February 24 (Leader)
2023-02-24 16:02:57
CEMPI
95.26
-0.07 -0.07%
CONCPI
89.90
+0.04 +0.04%
CLKPI
96.77
0.00 0.00%
SPPI
44.91
+0.04 +0.09%
MORPI
73.32
0.00 0.00%
The Department of Industry and Information Technology of Ningxia Hui Autonomous Region announced on May 21 that, in accordance with the relevant requirements of the Measures for the Implementation of Capacity Replacement in Cement and Glass Industry (2024 edition), the Department of Industry and Information Technology of Ningxia Hui Autonomous Region organized experts to conduct on-site verification and acceptance on May 20, 2026, after the application of enterprises and the preliminary examination by the industrial and information departments of Shapotou District and Zhongwei City. The main equipment of the cement clinker production line with a daily output of 2500 tons used by Ningxia Shengjin Cement Co., Ltd. for capacity replacement to Anhui Tongling Shangfeng Cement Co., Ltd. has been dismantled and does not have the capacity to resume clinker production.