On October 7, the Material and Equipment Branch of State Power Investment Group Co., Ltd. and Power Easy-to-buy (Beijing) Technology Co., Ltd. issued a tender announcement for e-commerce procurement of energy storage systems in 2023. The company plans to purchase 4.2G Wh lithium iron phosphate battery energy storage system and 1GWh 4h flow battery energy storage system , including 0.25C energy storage system 1.5G Wh and 0.5C energy storage system 2.5G Wh. 1C Energy storage system 0.
Details are as follows:
Tender Announcement
for E-commerce Procurement of Energy Storage System in 2023 of Materials and Equipment Branch of State Power Investment Corporation and Power Easy-to-buy (Beijing) Technology Co., Ltd. China Power Complete Equipment Co., Ltd. is entrusted by the tenderee to conduct public bidding for the following bid sections.
1. Bidding Conditions Tenderee: Materials and Equipment Branch of State Power Investment Corporation, Power Easy-to-buy (Beijing) Technology Co., Ltd. Bidding Agency: China Power Complete Equipment Co., Ltd. Source of Project Funds: Self-owned Funds and Bank Loans
2. Project overview and bidding scope
2.1 Lithium iron phosphate energy storage system
2.1.1 Bidding scope Procurement of lithium iron phosphate battery energy storage system, total capacity 4. Among them, lithium iron phosphate battery energy storage system (nominal capacity of battery monomer ≥ 280 Ah (except 1 C system)). The whole body of the energy storage system (including battery) is guaranteed for 5 years. Within the validity period of the bid, the tenderee does not guarantee 100% use of the above capacity. If the capacity is used up, the tenderee can continue to organize the procurement of the required model.
(2) If a bidder participates in a bid lot of a certain multiplier, The bidding documents of all bid sections under this multiplier shall be purchased and tendered at the same time, and the tender offer (total tender price and itemized offer) and tender scheme shall be the same. For example, if you participate in the 0.25 C bid section, you must purchase 0 at the same time.
(3) After the notice of winning the bid is issued, the successful bidder must sign the agreement for the entry of the electric energy e-purchase mall, register the fusion cloud chain, and sell the equipment within the scope of the bidding in the electric energy e-purchase enterprise mall of the State Power Investment Corporation. 2.1.2 Qualification requirements
for bidders of lithium iron
phosphate energy storage system (2.1.2.8
) Not included in the list of discredited persons to be executed by the Supreme People's Court on the "Credit China" website. It has not been included in the list of serious illegal and dishonest enterprises in the "National Enterprise Credit Information Publicity System" by the administrative department for Industry and commerce. Bidders are requested to consult the relevant websites by themselves and attach the screenshots of the inquiries to the bidding documents. 2.1.2.3
) The Tenderer shall provide the brand and model of the battery core used for the project and the type test report issued by the authority in accordance with GB/T36276, and the stage report is not accepted.
4) The core equipment (battery monomer, battery module, battery cluster, BMS, EMS, PCS) of the Bidder's integrated system shall be provided with type test reports or inspection reports (including test items and results) issued by CMA and CNAS qualified institutions that meet the requirements of national standards. 2.2
Flow battery energy storage system
2.2. The nominal power of the flow battery energy storage system (battery monomer) is ≥ 45kW, and the overall warranty period of the energy storage system (including battery) is 5 years. Within the validity period of the bid, the tenderee does not guarantee 100% use of the above capacity. If the capacity is used up, the tenderee can continue to organize the procurement of the required model.
(2) The bidder shall purchase the flow battery at the same time The bidding documents of the four bid sections shall be submitted at the same time, and the bidding quotation (total bidding price and itemized quotation) and the bidding scheme shall be the same, otherwise they shall be treated as invalid bidders.
(3) After the letter of acceptance is issued, the successful bidder shall sign the agreement on the entry of the electric energy e-purchase mall, register the fusion cloud chain, and sell the equipment within the scope of bidding in the electric energy e-purchase enterprise mall of the State Power Investment Corporation. 2.2.2 Qualification requirements
for
bidders (2.2.2.8
) Not included in the list of discredited persons to be executed by the Supreme People's Court on the "Credit China" website. It has not been included in the list of serious illegal and dishonest enterprises in the "National Enterprise Credit Information Publicity System" by the administrative department for Industry and commerce. Bidders are requested to consult the relevant websites by themselves and attach the screenshots of the inquiries to the bidding documents. 2.2.2.3
) The Tenderer shall provide the brand and model of the monomer stack used for the project and the product test report issued by the third party organization, and the stage report is not accepted.
4) The Tenderer shall provide the brand and model of PCS used for the project and the type test report or product certification issued by the authority.