Recently, Guangdong Energy Bureau of Guangdong Province approved the review opinions on the energy-saving report of Heshan Longji 10GW monocrystalline module project, and Heshan Longji 10GW monocrystalline module project was approved.
The original text is as follows:
Review Opinions
of Guangdong Energy Bureau on Energy Conservation Report of Heshan Longji 10G W Monocrystalline Module Project Yue Neng Xu Ke [2023] No.
116 Heshan Long Ji Photovoltaic Technology Co., Ltd. Company:
We have received the Energy Saving Report of Heshan Longji 10G W Monocrystalline Module Project. According to the relevant requirements of the Measures for Energy Conservation Review of Fixed Assets Investment Projects and the Implementation Measures for Energy Conservation Review of Fixed Assets Investment Projects in Guangdong Province, our Bureau has reviewed the energy conservation report of the project. The review opinions are as follows:
I. The main technical standards and construction schemes adopted by Heshan Longji 10G W monocrystalline module project comply with the requirements of relevant national energy-saving regulations and policies, and the energy-saving report of the project is approved in principle.
II. The main construction contents of the project include: construction of an annual output of 10g W & nbsp; Main buildings and structures of the N-type solar PV module production line include production workshop, warehouse, material recycling room, power center, chemical warehouse, complex building, activity center, dining hall, talent apartment, etc. Main equipment includes screen printing machine, rowing and welding machine, laminating machine, laminating machine, curing machine, lap welding machine, framing machine, water chiller, air compressor, etc. Energy consumption and main energy efficiency indicators of the project: When the project is completed and put into operation, the annual comprehensive energy consumption will not be higher than 21430 tons of standard coal (equivalent value), of which the annual power consumption will not be higher than 173.02 million kWh; the power consumption per unit of battery components of the project will not be higher than 17,300 kWh/MWp.
3. Your company is requested to implement the energy-saving measures in the energy-saving report in strict accordance with the industry standards and norms, give priority to the selection of products and equipment with leading energy efficiency standards, list the energy efficiency indicators as important technical indicators in the equipment bidding documents and procurement contracts, and not use the backward technology and equipment prohibited and eliminated by the state. In accordance with the Energy Management System-Requirements with Guidance for Use (GB/T & nbsp; 23331-2020), the Guidelines for Energy Management in Industrial Enterprises (GB/T & nbsp; 15587-2008), the General Principles for the Equipping and Management of Energy Measuring Instruments in Energy Using Organizations (GB & nbsp; 17167), improve the energy management system, equip energy measurement instruments, and establish an energy measurement management system.
4. Your company is requested to effectively supervise and inspect the design, construction, completion acceptance and operation management of the project according to the review opinions and the energy-saving report of the project, and timely report the implementation of the review opinions and major issues related to the project. Before the project is put into production and use, your company is requested to organize the acceptance of the energy-saving situation of the project, and submit the energy-saving acceptance report to our Bureau and Jiangmen Development and Reform Bureau for retention. At the same time, according to the relevant requirements of the Measures for Energy-saving Management of Key Energy-using Units (revised in 2018), access to the provincial energy consumption online monitoring system, and regularly submit the energy utilization status report. Jiangmen Municipal Development and Reform Bureau is requested to carry out energy conservation supervision on project organizations in accordance with the Measures for Energy Conservation Supervision (Decree No.33 of 2016 of the National Development and Reform Commission). Our Bureau will follow up and inspect the implementation of this energy conservation review opinion in due course.
5. Within two years from the date of issuance of this review opinion, if the project has not started construction, it will automatically become invalid. If it is necessary to postpone or change, it shall be implemented in accordance with Article 16 of the Measures for the Implementation of Energy Conservation Review of Fixed Assets Investment Projects in Guangdong Province (Guangdong Development and Reform Capital Ring [2018] 268).