The mining right of a limestone mine for building stones was sold in Xuancheng, Anhui, with a starting price of 270 million yuan.

2023-10-07 16:20:17

The resource reserve transferred this time is 14.625 million cubic meters, or 38.0253 million tons (including 3.9147 million tons of remaining resources of the original mining right and 34.1106 million tons of new resources).

On September 28, the Natural Resources and Planning Bureau of Xuanzhou District, Xuancheng City, Anhui Province, announced that the mining right of Dongsheng Limestone Mine for Building Stones in Xuancheng City, Anhui Province, would be sold for 12.8 years (including 2 years of capital construction) at a starting price of 270 million yuan. The mining area of the

project is 0.306 square kilometers, and the resource reserve transferred this time is 14.625 million cubic meters, or 38.0253 million tons (including 3.9147 million tons of remaining resources of the original mining right and 34.1106 million tons of new resources this time).

Listing time: November 1, 2023-November 15

, 2023 Starting and ending time of application: September 28, 2023-October 31

, 2023 Xuancheng is located in the southeast of Anhui Province, adjacent to Jiangsu and Zhejiang, near Shanghai and Hangzhou, and is a member of the Yangtze River Delta urban agglomeration. As one of the "two wings" of the demonstration area for undertaking industrial transfer in Wanjiang City Belt, it is an important comprehensive transportation hub in southeastern Anhui Province, with superior location and transportation advantages. In terms of

mineral resources, Xuancheng City is rich in mineral resources, the main energy minerals are coal, stone coal, geothermal and so on, of which the coal deposit reserves are small, due to environmental protection requirements, it has withdrawn from the development sequence. The mineral development of building materials mainly includes limestone for cement, sandstone for cement ingredients, building stone, granite for decoration, sand shale for bricks and tiles, etc.

The General Plan for Mineral Resources of Xuancheng City (2021-2025) clearly States that with the development of economy and society, the improvement of road traffic and urban and rural infrastructure, the promotion of urbanization and the moderate advance of infrastructure construction, the rigid market demand for common building materials such as sand, stone and soil will continue for a long time to come. During the planning period, it is necessary to release the production capacity of construction sand and gravel in an orderly manner, broaden the supply guarantee channels of construction sand and gravel, and effectively guarantee the market demand of construction sand and gravel.

To strengthen the overall planning and scientific and rational layout of the development of sand and gravel resources, the city has designated 16 sand and gravel centralized mining areas, giving full play to the guiding and gathering role of the centralized mining areas, and supporting the orderly delivery of sand and gravel mining rights for construction in the areas. In principle, the newly established sand and gravel mining rights for construction during the planning period should be located in key mining areas or sand and gravel centralized mining areas. The newly established sand and gravel mining rights for construction must meet the requirements of relevant laws, regulations and policies of the state and the province, and avoid areas where sand and gravel mining is prohibited by relevant laws and regulations. The mining scale of Xinli Sandstone Project is not less than 1 million tons per year, the service life is not less than 10 years, and the construction is strictly in accordance with the green mine standards.

All can be viewed after purchase
Correlation

The resource reserve transferred this time is 14.625 million cubic meters, or 38.0253 million tons (including 3.9147 million tons of remaining resources of the original mining right and 34.1106 million tons of new resources).

2023-10-07 16:20:17