Recently, Anhui Chaohu Ecological Environment Branch agreed to accept Chaohu Shangfeng Hengxin New Materials Co., Ltd. "Annual Output of 2 Million Tons of Cement Grinding Production Line Project (Relocation Project)" to publicize the acceptance. A new
project with an annual output of 200 10,000-ton cement grinding production line. The total designed production scale of the project is 2 million tons of cement per year, including 300,000 tons of M32.5 cement, 1 million tons of P.O42.5 cement, 300,000 tons of P.C42.5 cement and 400,000 tons of P.O52.5 cement. The proportion of bags and bulk is 10%: 90%. Product delivery mode: 40% by car, 50% by water, 10% by bag.
This project is a relocation and reconstruction project. A cement grinding station is relocated and reconstructed for the purpose of technology upgrading, energy consumption reduction, emission reduction and operation cost reduction. All equipment is purchased again. The project covers an area of about 98.96 mu, with a total construction area of 35607.52 square meters, including new factory buildings, clinker greenhouses, mixed material storage sheds, batching and finished product warehouses, office buildings, dormitory buildings, raw materials, namely cement belt conveyor corridors and roads, greening and other supporting facilities. The project constructs a cement grinding production line with an annual output of 2 million tons per year.