Down 8.28%! Longji Silicon Wafer Price Reduction Again (9.26)

2023-09-26 09:19:57

Compared with the previous period, it decreased by 0.28 yuan per piece, a decline of 8.28%.

On September 25, Longji Green Energy announced the latest price of silicon wafers on its official website. This time, the price of P-type M10 150 μm thickness is 3.1 yuan/piece, which is 0.28 yuan/piece lower than previous period, with a decline of 8.28%.

All can be viewed after purchase
Correlation

By the end of 2023, the market share of N-type silicon wafers exceeded 50%.

2023-12-28 16:49:21

Added quotation for N-type silicon wafer.

2023-12-27 08:58:56

P-type M10 stocks are sold centrally, while N-type silicon wafers are relatively supported.

2023-12-21 14:25:31

Prices of M10 monocrystalline silicon wafers fell the most.

2023-12-14 14:27:43

The proportion of downstream N-type silicon wafers has increased rapidly, and the pressure of P-type M10 silicon wafers has increased.

2023-12-07 17:38:52

Part of the category from stop to fall.

2023-11-30 18:48:36

It is expected that the price of silicon wafers will stop falling and stabilize in the short term.

2023-11-17 09:11:32

Wafer production is expected to recover to between 53-55 GW in November.

2023-11-10 10:36:39

Longji Green Energy and TCL Central have announced the latest silicon wafer prices, which have been reduced by 6%-8.3% compared with the previous period.

2023-09-27 09:28:02

Compared with the last time, the price of silicon wafers has been lowered across the board.

2023-09-26 09:20:04

Compared with the previous period, it decreased by 0.28 yuan per piece, a decline of 8.28%.

2023-09-26 09:19:57

Wuliangye Kangding Wenlu Hotel Project Construction General Contracting recently announced that the Eighth Bureau of China Construction won the bid with about 477 million yuan. Located at the foot of Paomashan Scenic Area in Kangding City, Ganzi Prefecture, Sichuan Province (the hometown of love songs), the project is positioned as an international five-star comprehensive resort hotel with a total construction area of about 34,000 square meters and 190 rooms planned. The project is located in the western Sichuan Plateau, with a planned construction period of 870 calendar days (about two and a half years), requiring high standards for hardcover, electromechanical, intelligent and architectural aesthetics.