Letter on Confirming the Transfer of 600 Tons/Day Glass Production Capacity Index of Ningbo Kangli Glass Co., Ltd.

2023-02-06 14:35:23

The transfer report of Ningbo Kangli Glass Co., Ltd. to Benxi Fuyao Float Glass Co., Ltd. with a production capacity of 600 tons per day was approved.

Ningbo Bureau of Economy and Information Technology:

We have received your Report on the Transfer of Glass Production Capacity of Ningbo Kangli Glass Co., Ltd. (YJXJ [2023] No.42). After examination, the production capacity index of 600 tons per day of Ningbo Kangli Glass Co., Ltd. was transferred to Benxi Fuyao Float Glass Co., Ltd. as the construction capacity index of its 600 tons per day float glass production line project, which meets the requirements of the "Measures for the Implementation of Capacity Replacement in Cement Glass Industry" (Ministry of Industry and Information Technology No.2021). It is hereby confirmed and announced.

Attachment: Ningbo Kangli Glass Co., Ltd. 600 Tons/Day Glass Production Capacity Index Transfer Notice

Zhejiang Provincial Department of

Economy and Information Technology February 3


, 2023 Attachment

Ningbo Kangli Glass Co., Ltd. 600 Tons/Day Glass Production Capacity Notice on

Index Transfer According to the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (original [2021] No.80 of the Ministry of Industry and Information Technology), the transfer of 600 tons/day glass production capacity index of Ningbo Kangli Glass Co., Ltd. is hereby notified, and the public is welcome to supervise. Tel: 0571-87058271. Department of

Economy and Information Technology

of Zhejiang Province, February 3

, 2023
All can be viewed after purchase
Correlation

The transfer report of Ningbo Kangli Glass Co., Ltd. to Benxi Fuyao Float Glass Co., Ltd. with a production capacity of 600 tons per day was approved.

2023-02-06 14:35:23

Yanling New City Life and Health R & D and Production Base Project is located in Dongxihu District of Wuhan City, which is a R & D and production base project in the field of life and health. The project includes supervision services in the whole process of construction and warranty stage, as well as general contracting of survey, design and construction (the first bid section). The planned construction period of the project is 2190 days, with a total construction area of about 474000 square meters, including the construction of a large health industry base and a digital intelligent brewing production center.