[Video] Shuangyashan Mine Restoration Project Receives 300 Million yuan, Green Mine Construction Is on the Way

2023-06-01 14:46:15

This is the only demonstration project in Heilongjiang Province, which will receive 300 million yuan of financial support from the state, and also become the first time that Heilongjiang Province has received central awards and subsidies for mine ecological restoration.

On May 24, the Ministry of Finance announced the competitive selection results of the 2023 demonstration project of ecological restoration of abandoned mines left over from history. The demonstration project of ecological restoration of abandoned mines left over from history in Sanjiang Plain (Shuangyashan District) of Heilongjiang Province declared by Shuangyashan City was successfully selected with the second overall score. This is the only demonstration project in Heilongjiang Province, which will receive 300 million yuan of financial support from the state, and also become the first time that Heilongjiang Province has received central awards and subsidies for mine ecological restoration. 

All can be viewed after purchase
Correlation

This is the only demonstration project in Heilongjiang Province, which will receive 300 million yuan of financial support from the state, and also become the first time that Heilongjiang Province has received central awards and subsidies for mine ecological restoration.

2023-06-01 14:46:15

Lianyungang Pumped-storage Power Station is a first-class large (1) project. Its pivotal structures are mainly composed of upper reservoir, lower reservoir, water conveyance system, underground powerhouse system and ground switching station. The installed capacity of the power station is 1200 MW, which is a daily regulation power station. The power station is equipped with four single-stage vertical shaft mixed-flow reversible pump-turbine generator units with a single unit capacity of 300 MW and a rated head of 425m.