Digital building materials DataBM. Com on May 30, Zhejiang Qibin Changxing 600 tons of second-line cold repair on June 1 has been determined.

The cold repair of Changxing Line 2 (600 tons) in Qibin, Zhejiang has been confirmed.
Digital building materials DataBM. Com on May 30, Zhejiang Qibin Changxing 600 tons of second-line cold repair on June 1 has been determined.
The cold repair of Changxing Line 2 (600 tons) in Qibin, Zhejiang has been confirmed.
2023-05-30 15:30:49
CEMPI
102.3
+0.13 +0.13%
CONCPI
92.33
-0.57 -0.61%
CLKPI
105.09
+1.12 +1.08%
SPPI
44.88
0.00 0.00%
MORPI
75.16
-0.30 -0.40%
Wang Zhenxing was elected as the chairman of the eleventh board of directors of the company and served as the legal representative, with the same term of office as the current board of directors.