Bidding for the transfer of the mining right of a limestone mine for building stones in Xuchang, Henan, with a starting price of 700 million yuan

2023-05-26 09:49:32

The reserve of 26143 is. 3 million tons, the designed and utilized reserve is. 2 million tons of 24484, and the recoverable reserve of the mine is 232.6 million tons.

On May 24, Xuchang Natural Resources and Planning Bureau issued a notice to invite tenders for the transfer of mining rights in the centralized limestone mining area for building stones in Magou, Yuzhou City, with a starting price of 704.778 million yuan for 17 years. The mining area of the

project is 2.7117. Square kilometers, with a 26143 of, tons of resources, a designed reserve of, tons of 24484, and a recoverable reserve of 232.6 million tons. Starting and ending time of

application: 2023-05-24 — 2023-05-

31 Tendering time: & nbsp; 2023-06-26

All can be viewed after purchase
Correlation

The reserve of 26143 is. 3 million tons, the designed and utilized reserve is. 2 million tons of 24484, and the recoverable reserve of the mine is 232.6 million tons.

2023-05-26 09:49:32

Grinding technology and equipment of wet slag discharge vertical mill; key technology of Bayer process red mud quality control to produce matrix composite materials; key technology and equipment of comprehensive utilization of fly ash quality improvement and carbon reduction; technology of solid waste resource utilization coupled with carbon dioxide capture and storage utilization (CCUS); remanufacturing technology of wear-resistant parts of mechanical equipment; remanufacturing technology of permanent magnetization of old motors; The green remanufacturing technology of high-precision and long-life gearboxes has been listed in the Catalogue of Advanced and Applicable Technology and Equipment for Comprehensive Utilization of National Industrial Resources (2025 edition).