Hunan Bureau Carries out Supervision and Inspection in Yueyang City- "Checking Enterprises and Supervising Government" to Promote the High-quality Development of Mining Enterprises

2023-05-26 09:25:29

"Why can't enterprises find problems by self-examination, and we check a lot of hidden problems?" At the inspection briefing, this issue was repeatedly mentioned.

In order to further promote the comprehensive improvement of mine safety production and carry out special supervision on the investigation and management of major hidden dangers, from May 8 to 12, Wu Weilong, secretary and director of the Hunan Bureau of the State Administration of Mine Safety, led a team to supervise and inspect the work of mine safety supervision in Yueyang City. The government of Linxiang City, Pingjiang County, Yueyang County and the mine supervision department were inspected, and seven non-coal mines, three tailings reservoirs and six abandoned mine closure points were checked on the spot, 97 hidden dangers (including four major hidden dangers) were found, four mines were transferred to file for investigation, two mines were ordered to stop production and rectify, and territorial supervision was further compacted. Escort the safe and high-quality development of mining enterprises.

Pingjiang County is one of the 15 key counties in the province, with 21 non-coal underground mines and 19 tailings reservoirs, ranking eighth and first in the province respectively. The inspection team found that the comprehensive improvement of mine safety in the city was "hot and cold", some enterprises were not serious in self-examination and self-improvement, and the quality of the "two lists" of hidden problems and risk provention and control reported was not high.

"Only 2 general hidden dangers on the ground were found in the self-examination of 77 items in 11 categories of comprehensive renovation in your mine." When the members of the inspection team read the "two lists" of Ziyuan Niobium and Tantalum of Hongyuan Mining Co., Ltd. one by one, they seriously pointed out that self-examination was a mere formality, and what was more prominent was that Taoping Lead-Zinc Copper Mine in the central part of Pingjiang County had not carried out self-examination and self-correction of mine safety comprehensive improvement at all. At the same time, serious problems were found in the process of spot check of safety education and training. Some workers' examination papers were not written by themselves; some new workers' examination papers were not signed; some new and old workers were not trained separately.

To this end, the inspection team requires local regulatory authorities to urge mining enterprises to conduct a self-examination and self-correction in strict accordance with 210 items of comprehensive improvement of mine safety, and to do a good job in staff training management according to the five unified requirements of "management, training, inspection, assessment, rewards and punishments", so as to further consolidate the safety foundation. The foundation of

safety management is weak, and there are many

problems in construction not according to the design, such as "the ventilation system is not perfect, a 2 × 5.5KW local ventilator in the + 430m middle section supplies air to two heading faces at the same time, and the air volume of the heading face is insufficient". Cai Qikai, a second-level investigator of the Non-Coal Department of Hunan Bureau, seriously pointed out this major potential safety hazard at the briefing on the inspection of Taoping Lead-Zinc Copper Mine of Pingjiang Central Mining Co., Ltd. The inspection team also found that the safety management system of the mine was not perfect, the construction was not in accordance with the design, and the mining roadway was illegally excavated in the middle section of + 430m before the power supply system and ventilation system were formed.

Under the careful inspection of the inspection team, there are still many problems that are not constructed according to the design: before the perfect ventilation system is formed in Chuanziyuan Niobium-Tantalum Mine of Hongyuan Mining Co., Ltd. in Pingjiang County, cross-vein tunneling and + 170m ~ + 140m ramp tunneling are arranged in violation of regulations; The 2.2KW local ventilator selected by Jiangdong Gold Mine of Hunan Gold Tianyue Mining Co., Ltd. can not meet the ventilation needs, and the air volume of the working face is insufficient; some mines are not equipped with mechanical and electrical facilities and equipment according to the design requirements, and some equipment has not obtained the safety mark of mining products. While finding out the hidden problems, the

inspection team also provided assistance and guidance to the relevant responsible persons of the enterprise, and put forward specific rectification suggestions and countermeasures to help the enterprise improve its safety management ability and level. The main reason

is that the main responsibility of

mining enterprises is not implemented. "Why can't enterprises find problems by self-examination, and we check a lot of hidden problems?" At the inspection briefing, this issue was repeatedly mentioned. When the

inspection team consulted the data on the spot, it found that the main responsibility of mining enterprises was not in place, the safety responsibility system was not perfect, the safety management organization was not in place, and the safety management personnel were not fully equipped. Among them, the chairman of Chuanziyuan Nb-Ta Mine of Hongyuan Mining Co., Ltd. has been absent from the mine for a long time, unable to perform the duties of the first person responsible for safety production, the safety inspectors are insufficient, and the internal safety supervision is "absent"; Yueyang Changjia Trading Co., Ltd. has no appointment documents for the general manager, the main person in charge, the full-time safety officer and other safety management personnel; The mine leaders of Yueyang Fu'an Mining Co., Ltd. and Linxiang Rio Tinto Mining Co., Ltd. did not go down the well according to the regulations.

In addition, the inspection team in the supervision and inspection of Yueyang County, Linxiang City and Pingjiang County and the regulatory authorities found that there is a gap in the implementation of the responsibility of underground mine contact guarantee, the professional and technical strength of county-level supervisors is relatively weak, the supervision and law enforcement plan is not perfect, the law enforcement procedures are not standardized, the ability to investigate and deal with major hidden dangers is not strong, and major risks can not be focused on.

Next, Hunan Bureau will send "Supervision Suggestions on Strengthening and Improving Mine Supervision" to Yueyang Municipal Government, suggesting that Yueyang Municipal Government hold a standing meeting to study the work of mine safety production, to study and solve the systematic and regional risks of mine safety, and to study and solve the problems of mine safety. According to the requirements of "three batches" (eliminating and withdrawing a batch, integrating and reorganizing a batch, transforming and upgrading a batch), we should formulate a comprehensive mine renovation plan, specify the specific list of mines and the time limit for completion, resolutely eliminate and withdraw non-coal mines that have no resources, no funds and no management for a long time, and have resources and can ensure safe investment. We should provide technical and policy services, change the small-scale, low-level development and extensive development mode of non-coal mines from the source, achieve reduction and quality improvement, and resolutely prevent major accidents.

All can be viewed after purchase
Correlation

"Why can't enterprises find problems by self-examination, and we check a lot of hidden problems?" At the inspection briefing, this issue was repeatedly mentioned.

2023-05-26 09:25:29

Grinding technology and equipment of wet slag discharge vertical mill; key technology of Bayer process red mud quality control to produce matrix composite materials; key technology and equipment of comprehensive utilization of fly ash quality improvement and carbon reduction; technology of solid waste resource utilization coupled with carbon dioxide capture and storage utilization (CCUS); remanufacturing technology of wear-resistant parts of mechanical equipment; remanufacturing technology of permanent magnetization of old motors; The green remanufacturing technology of high-precision and long-life gearboxes has been listed in the Catalogue of Advanced and Applicable Technology and Equipment for Comprehensive Utilization of National Industrial Resources (2025 edition).