Sale of idle assets of two 2500t/d clinker production lines under Tianshan Stock Company

2023-09-14 10:22:46

It is understood that the transfer target is the idle assets of two 2500t/d clinker production lines of Hunan Pingtang Southern Cement Co., Ltd., which was officially shut down in July 2016. After the shutdown, the equipment and structures have been idle for a long time without regular maintenance, maintenance and technical transformation, and can no longer meet the production requirements of energy saving and environmental protection. Some facilities are seriously rusted and have potential safety hazards.

According to a trading platform, the idle assets of two 2500t/ d clinker production lines of Hunan Pingtang Southern Cement Co., Ltd. are being transferred, with a listing price of 17.95 million yuan.

It is understood that the transfer target is the idle assets of two 2500t/d clinker production lines of Hunan Pingtang Southern Cement Co., Ltd., which were officially shut down in July 2016. After the shutdown, the equipment and structures have been idle for a long time without regular maintenance, maintenance and technical transformation. It can not meet the production requirements of energy saving and environmental protection, some equipment and facilities have rusted, and some facilities have potential safety hazards due to serious rust.

The disposal scope of the subject is:

A. List of machinery and equipment: from the heavy plate feeder at the limestone crushing feed inlet to the chimney of the kiln head exhaust fan. Comprises a pulverized coal preparation and conveying system, a raw material proportioning station and conveying system, a raw material grinding and raw material warehousing system, a sintering kiln tail and waste gas treatment system, a raw material homogenizing silo and raw material kiln feeding system, a raw coal storage yard and conveying system, and waste heat power generation equipment.

B. List scope of structures: waste heat boiler plant at kiln head and kiln tail, raw material homogenization silo and raw material feeding kiln, limestone crushing system, firing kiln head and conveying, pulverized coal preparation and conveying, firing kiln tail, raw material grinding and lubricating machine room, vertical mill and waste gas treatment, kiln head, kiln middle, kiln tail frame, raw material batching station, firing kiln middle, pulverized coal preparation, Electrical room of raw material batching station and other structures.

All can be viewed after purchase
Correlation

It is understood that the transfer target is the idle assets of two 2500t/d clinker production lines of Hunan Pingtang Southern Cement Co., Ltd., which was officially shut down in July 2016. After the shutdown, the equipment and structures have been idle for a long time without regular maintenance, maintenance and technical transformation, and can no longer meet the production requirements of energy saving and environmental protection. Some facilities are seriously rusted and have potential safety hazards.

2023-09-14 10:22:46

In order to implement the decision-making and deployment of high-quality development of national industry, implement Guangxi's "Several Policies and Measures to Promote Steady Growth of Industrial Economy in the Second Quarter of 2025", study the spirit of China Cement Association's Conference on High-quality Development of Cement Industry in 2025, and discuss the market in the second quarter, Guangxi Cement Association organized a conference on high-quality and steady growth of Guangxi Cement in Nanning on May 20. Senior leaders of China's leading cement enterprises (Tianshan Materials, Conch, China Resources, Red Lion, etc.) Group, led by Liu Zonghu and Lu Hong, attended the meeting and reached consensus with representatives of Guangxi enterprises on issues such as industry development and off-peak production.