Recently, the government of Lixin County, Bozhou City, Anhui Province, released public information that on January 13, 2023, the Lixin County Ecological Environment Branch approved the Environmental Impact Report Form of the Green Intelligent Upgrading and Technical Reform Project of the Cement Grinding Production Line of Lixin County Bird's Nest Cement Co., Ltd. The Ecological Environment Branch of Lixin County, Bozhou City,
Anhui Province, approved the contents and conclusions of the Report Form on the Environmental Impact Report Form of the Green Intelligent Upgrading and Technical Renovation Project of the Cement Grinding Production Line of Lixin Bird's Nest Cement Co., Ltd.
The project is located in the existing factory area of Lixin Bird's Nest Cement Co., Ltd. in Lixin County, with a total investment of about 95.8 million yuan, including 1.6 million yuan for environmental protection.
The project will not add new land, demolish the existing backward cement grinding production line with an annual output of 600000 tons, build a new green intelligent cement grinding production line with an annual output of 1.2 million tons, and build public auxiliary facilities such as power supply and distribution, water supply and drainage, fire protection and environmental protection. After the
project is completed and put into operation, the annual production capacity of 1.2 million tons of cement will be formed. The project is in line with the current national industrial policy. After earnestly implementing the pollution prevention and ecological protection measures proposed in the Report Form and this reply, from the perspective of environmental protection. The Ecological Environment Sub-bureau of Lixin County, Haozhou City agrees that Bird's Nest Cement Co., Ltd. shall carry out the construction according to the nature, scale, location, production process, environmental protection measures and the following requirements of the construction project listed in the Report Form.