Lowest 1.201 yuan/watt! Yiyi, Longji, Jingke, Dongfang Risheng and other 7 companies intend to share the bidding of 10.6G W components

2023-09-01 11:29:22

Yidao Xinneng, Longji Green Energy, Jingke Energy, Dongfang Risheng, Yingli and Trina Solar are the first successful candidates respectively.

On August 30, the successful candidates for the framework collection of photovoltaic modules of CGN New Energy from 2023 to 2024 were announced, including Yidao Xinneng, Longji Green Energy, Jingke Energy, Dongfang Risheng, Yingli, Trina Solar Energy and Tongwei. Yidao Xinneng, Longji Green Energy, Jingke Energy, Dongfang Risheng, Yingli and Trina Solar are the first successful candidates respectively.

According to the tender announcement on July 13, the tender volume of CGN components is expected to be 6.3GW and the reserve volume is 6.3GW, which is divided into seven bidding sections, of which seven bidding sections have not yet been completed.

All can be viewed after purchase
Correlation

Yidao Xinneng, Longji Green Energy, Jingke Energy, Dongfang Risheng, Yingli and Trina Solar are the first successful candidates respectively.

2023-09-01 11:29:22

The Department of Industry and Information Technology of Ningxia Hui Autonomous Region announced on May 21 that, in accordance with the relevant requirements of the Measures for the Implementation of Capacity Replacement in Cement and Glass Industry (2024 edition), the Department of Industry and Information Technology of Ningxia Hui Autonomous Region organized experts to conduct on-site verification and acceptance on May 20, 2026, after the application of enterprises and the preliminary examination by the industrial and information departments of Shapotou District and Zhongwei City. The main equipment of the cement clinker production line with a daily output of 2500 tons used by Ningxia Shengjin Cement Co., Ltd. for capacity replacement to Anhui Tongling Shangfeng Cement Co., Ltd. has been dismantled and does not have the capacity to resume clinker production.