Suhengzhen Glass Technology Co., Ltd. has an annual output of 5 million square meters of tempered glass and 50,000 square meters of ground glass. Project name: annual output of 5 million square meters of tempered glass, 50,000 square meters of ground glass, 50,000 square meters of laminated glass, 150,000m2 Insulating Glass Project
Construction Nature : Newly-built;
Project Undertaker : Jiangsu Hengzhen Glass Technology Co., Ltd.;
Project construction site : No.9, Dongkan Industrial Park, Binhai County, Yancheng City, Jiangsu Province;
total investment: 60 million yuan;
Contact person/telephone: yuan Zhihu 15189334444
Publicity time: 5 working days from the date of publication.
(1) Wastewater
The domestic sewage of this project is discharged into the sewage treatment plant in the north of Binhai County after being pretreated by the three-compartment septic tank. The tail water is discharged to the south of the Huaihe River into the sea. The wastewater from edge grinding, drilling and cleaning is reused after being treated by the sedimentation tank, which has no significant impact on the surface water in the region.
(2) Waste gas
The frosted waste gas of this project is collected by the gas collecting hood and treated by the bag-type dust collector, and the treated waste gas is discharged through the 15 m high DA001 exhaust funnel; A small amount of organic waste gas generated by laminated glass pressing, insulating glass gluing and edge sealing is collected by a gas collecting hood and treated by secondary activated carbon, and the treated waste gas is discharged through a 15 m high DA002 exhaust funnel. Uncollected exhaust gas is discharged without organization in the workshop. The project needs to set 50 m health protection distance with production workshop 1 and production workshop 2 as the boundary. It has little impact on the regional atmospheric environment.
(3) Noise
The noise pollution source of this project is mainly the equipment operation noise, and the sound level of the noise source ranges from 80 to 90dB (A). The noise emission at the factory boundary of the project can meet the requirements of Class 3 standard in the Emission Standard for Industrial Enterprises Noise at Boundary (GB12348-2008), and has little impact on the surrounding acoustic environment.
(4) The domestic garbage and waste bags generated in the production process of the solid waste
project shall be collected and handed over to the environmental sanitation department for disposal; the glass waste, collected dust, sediment in the sedimentation tank and waste aluminum strips shall be collected and handed over to the material recycling company for disposal; the waste carborundum shall be recycled by the original manufacturer; Waste rubber, waste rubber barrels and waste activated carbon shall be collected and regularly entrusted to qualified units for disposal. Therefore, the solid waste of this project can be effectively and reasonably treated and disposed, and will not cause secondary pollution to the environment.
To sum up, after strictly following the relevant measures proposed in this environmental impact assessment, the discharge can be up to the standard, and the measures adopted are feasible.
Publicity matters: The public can contact the construction unit or the environmental assessment unit by telephone or fax to put forward relevant environmental protection requirements or suggestions for the proposed project.
Environmental impact assessment unit: Yancheng Yusheng Environmental Engineering Co., Ltd.
Address: No.
107, Building 2, Chenggang Bay, south side of Yongkang Road, west side of Gangcheng Road, Binhai County, Yancheng City Contact person: Chen Shengjiang & nbsp; Contact Telephone/Fax: Announcement
Sand Glass, 50,000m2 Laminated Glass and 150,000m2 Insulating Glass Project