of January 4, Liaocheng Bureau of Industry and Information Technology of Shandong Province, together with relevant departments such as the Municipal Development and Reform Commission, the Municipal Natural Resources and Planning Bureau, the Municipal Ecological Environment Bureau and the Municipal Market Supervision and Administration Bureau, carried out on-site verification and acceptance of the demolition of the 3.2m mill of Linqing Datang Building Material Industry Co., Ltd. The
acceptance team listened to the report on the demolition of two 3.2m mills of Linqing Datang Building Material Industry Co., Ltd., reviewed the relevant materials, watched the photos and video recordings before and after the demolition of the relevant equipment, and checked the demolition site of the relevant equipment on the spot. It is confirmed that the removal devices include two 3.2m × 13m mills, roller mill, grinding head oil station, grinding tail oil station, reducer oil station, motor oil station, slow drive motor, high-voltage motor, etc., all of which are removed in place and do not have production capacity, and unanimously agreed to pass the acceptance.
Successfully passed the acceptance of the 3.2m mill of Linqing Datang Building Materials Industry Co., Ltd., marking the successful completion of the "three resolute" key tasks of Liaocheng in 2022.
Next, the Bureau of Industry and Information Technology will continue to strengthen supervision, curb the new capacity of "two high" projects, and promote the development of cement industry towards green and high-end.