27, Longji Green Energy released its annual report for 2022.
In 2022, Longji Green Energy achieved an operating income of 128.998 billion yuan, a year-on-year increase of 60.03%; the net profit attributable to shareholders of listed companies was 14.812 billion yuan, a year-on-year increase of 63.02%
, and the annual operating income exceeded 100 billion yuan for the first time.
Components achieve "three consecutive championships" & nbsp;
At present, Longji Green Energy has formed five business sectors
of monocrystalline silicon wafers, battery components, industrial and commercial distributed solutions, green energy solutions and hydrogen energy equipment. The production bases of monocrystalline silicon rods and wafers are mainly concentrated in Shaanxi (Xi'an), Ningxia (Yinchuan, Zhongning), Yunnan (Lijiang, Baoshan, Qujing, Chuxiong, Tengchong) and Malaysia (Kuching);
Monocrystalline battery production bases are mainly concentrated in Shaanxi (Xi'an), Ningxia (Yinchuan), Jiangsu (Taizhou), Malaysia (Kuching) and Vietnam (Beijiang);
Module production bases are mainly concentrated in Anhui (Chuzhou), Zhejiang (Quzhou and Jiaxing), Jiangsu (Taizhou), Shaanxi (Xi'an and Xianyang), Shanxi (Datong), Qinghai (Hainan) and Vietnam (Beijiang);
photovoltaic hydrogen production is currently located in Jiangsu (Wuxi).
By the end of 2022, the Company's monocrystalline silicon wafer production capacity will reach 133GW, monocrystalline battery production capacity will reach 50GW, and monocrystalline module production capacity will reach 85GW.
In 2022, the company achieved 85.06 GW of monocrystalline silicon wafer shipments, including 42.52 GW for external sales and 42.54 GW for self-use; Monocrystalline module shipments reached 46.76 GW, including 46.08 GW for external sales and 0.68 GW for self-use. The company's module shipments once again ranked first in the world, achieving "three consecutive championships".
2023 Development Goal: Revenue Exceeds 160
Billion In 2022, the annual revenue of Longji Green Energy will exceed 100 billion for the first time, and it will be 160 billion!
Longji Green Energy released its development goals for 2023.
By the end of 2023, the planned annual production capacity of monocrystalline silicon wafers will reach 190 GW, the annual production capacity of monocrystalline batteries will reach 110 GW, and the annual production capacity of monocrystalline modules will reach 130 GW.
In 2023, it is planned to achieve the shipment target of 130GW monocrystalline silicon wafers (including self-use) and 85GW batteries and components (including self-use).
In 2023, it plans to achieve business income of more than 160 billion yuan.
In 2021, Longji Green Energy formally established Longji Hydrogen Energy, aiming to become the world's leading provider of large-scale green hydrogen equipment and solutions. The
hydrogen sector business is not mentioned too much in the 2022 annual report, but it can also be seen that considerable progress has been made in 2022.
Longji Green Energy said that the company insisted on promoting business innovation, accelerating the expansion of new businesses such as hydrogen energy, and promoting the continuous improvement of green energy solution capabilities. The company successfully won the bid for the first 10000-ton photovoltaic green hydrogen demonstration project in China, Sinopec Xinxing Xinjiang Kuqa Green Hydrogen Demonstration Project.
In addition, on April 10, 2023, Longji Green Energy announced that the core managers of the team, composed of Chairman Zhong Baoshen, founder Li Zhenguo, Liu Xuewen, Li Wenwen, She Haifeng and Tian Ye, took the lead in increasing the premium of Xi'an Longji Hydrogen Energy Technology Co., Ltd. Undoubtedly, it demonstrates the confidence and determination in the development of the hydrogen energy plate!
It is foreseeable that the hydrogen energy sector will be the next business development point of Longji Green Energy.