Leiyang, Hunan, sold the mining right of a limestone mine for building stones at a starting price of 30 million yuan

2023-08-25 14:43:41

The mining right of limestone mine for building stones in Shitang Mining Area, Leiyang City, Hengyang City, Hunan Province is to be transferred by listing for 8.7 years (the service life of the mine plus one year of capital construction period), with an initial listing price of 30 million yuan.

On August 24, Hengyang Public Resources Trading Center announced that the mining right of limestone mine for building stones in Shitang Mining Area, Leiyang City, Hengyang City, Hunan Province would be sold for 8.7 years (mine service life plus one year capital construction period), with a starting price of 30 million yuan. The mining area of the

project is 0.1347 square kilometers, with a recoverable resource reserve of 6.809 million tons. Starting and ending time of

application: September 25, 2023-October 12

, 2023 Listing time: August 24, 2023-September 22

, 2023 Hengyang City is located in the south-central part of Hunan Province, with superior geographical location and convenient transportation. In terms of mineral resources, by the end of 2020, 69 minerals have been discovered in Hengyang City, accounting for 57.02% of the discovered minerals in Hunan Province, with 876 mineral deposits and mineral occurrences. It mainly completed 1: 200,000 regional geological and mineral survey; 1: 250,000 Hengyang regional geological survey; 1: 50,000 regional geological and mineral survey of Guanshi Street, Zhangshujiao, Tiesitang and Caoshi. According to the survey, more than 95% of the city's coal reserves are concentrated in Leiyang City and Changning City; 99.14% of the iron ore reserves are concentrated in Qidong County; the manganese ore reserves are mainly concentrated in Leiyang City and Hengyang County; 98.06% of the vanadium ore reserves are concentrated in Hengyang County; and the non-ferrous metal ore reserves are mainly concentrated in Changning City, Hengnan County and Hengdong County.

The 14th Five-Year Plan for the Development of Natural Resources in Hengyang City points out that the development and protection of strategic mineral resources should be strengthened. We will strengthen the management of the protection and exploitation of advantageous mineral resources, strictly manage the access to the development of mineral resources, strengthen the supervision and protection of mining areas with important value to the national economy, and strengthen the strategic reserve of important minerals. During the 14th Five-Year Plan period, we will focus on the exploration and development of strategic and advantageous mineral resources such as copper, lead, zinc, tungsten, fluorite, barite, rock salt, mirabilite and gold. We will carry out the development of high-quality non-metallic minerals such as kaolin, feldspar, decorative stone and calcite, as well as geothermal and common building stone minerals in a scientific and orderly manner. The mining of coal, iron, vanadium, gypsum and pyrite shall be strictly restricted; the mining of arable land and clay ore for bricks and tiles shall be prohibited, and the mining of stone coal and mercury ore shall be completely withdrawn. The development and utilization of other minerals should conform to the existing laws and regulations, industrial policies and mineral resources planning.

Standardize the management of important mineral resources covered by construction projects. In addition to the construction projects implemented by mining enterprises within the mining area, other construction projects must carry out the inquiry of important mineral resources. Standardize the examination and approval of overburden mineral resources, and strictly examine and approve the construction projects that really need to cover important mineral resources in accordance with the law and regulations. No construction shall be allowed without approval.

Complete the investigation of the current situation of mineral resources development and utilization in the whole city, and comprehensively grasp the quantity, quality, spatial distribution and development and utilization status of 57 kinds of mineral resources. Dynamically investigate and evaluate the utilization status and development potential of mineral resources with good resource endowment, urgent need for economic development and good industrial foundation. To formulate and implement a new round of overall planning for mineral resources, special planning for strategic mineral exploration, and special planning for county-level sand, stone, and soil mines, and comprehensively implement the requirements for land and space management and control and the transformation and development of the mining industry. Draw up the list of strategic mineral resources, formulate the implementation plan of strategic mineral exploration, promote the exploration of strategic minerals, and timely update and adjust the list of strategic minerals. Strict planning approval, implementation and revision procedures, strengthen the total amount control of mineral resources exploitation, implement zoning management and control of exploration and exploitation planning, implement differentiated management of different minerals, and promote the transformation of mineral resources exploration and exploitation to intensive processing and high value-added mining industry economy from the planning link. While doing a good job in traditional geological survey, we should actively expand ecological geological survey and comprehensive geological survey of natural resources. According to the reform plan of reserves management of the Ministry of Natural Resources, we should do a good job in the conversion, dynamic monitoring and timely updating of mineral resources reserves under the new standards.

Reasonably set up mining rights. We will fully implement the "double responsibility" system for mining management and ecological restoration, implement the planning, project environmental assessment and emission permit system one by one, and coordinate the examination and approval of mining, land use and forest use. We will standardize the management of financially funded exploration projects, strictly control the commercial exploration rights, and shift the focus of geological exploration to minerals needed for people's livelihood, emerging energy and strategic minerals, as well as hydrogeology, engineering geology and environmental geology. To optimize the structure of mining rights, in addition to the national strategic minerals, high added value, supporting industries and ensuring people's livelihood needs, no new mining rights will be established, the continuation of existing mining rights will be standardized, the elimination of backward production capacity will be speeded up, and the number of mining rights in the city will be controlled within 300 by the end of 2025. Strict management of mining rights. We will comprehensively implement the competitive transfer of mining rights and the "net ore" transfer, and improve the pricing mechanism for the initial price of the transfer of mining rights. We will accelerate the special rectification of open-pit mines focusing on sand and gravel mines, classify and dispose of mining rights within the red line of natural reserves and ecological protection according to law, continuously rectify "small, scattered, chaotic and dirty" mines, and promote the large-scale and intensive development and utilization of mineral resources. We will improve the coordination and information sharing mechanism with emergency management departments, and discover and severely crack down on illegal exploration and mining activities such as "ultra-deep cross-border" in real time.

All can be viewed after purchase
Correlation

The mining right of limestone mine for building stones in Shitang Mining Area, Leiyang City, Hengyang City, Hunan Province is to be transferred by listing for 8.7 years (the service life of the mine plus one year of capital construction period), with an initial listing price of 30 million yuan.

2023-08-25 14:43:41