Amount 800 million! Zhejiang annual output of 18 million tons of sand and gravel project bidding!

2023-08-25 09:24:05

Yunhe County, Lishui City, Zhejiang Province, issued the Tender Announcement for the Comprehensive Development and Utilization Project of Ordinary Building Stone Mine in Chilong Mining Area, Bailongshan Street.

Recently, Yunhe County, Lishui City, Zhejiang Province, issued the Tender Announcement for the Comprehensive Development and Utilization of Ordinary Building Stone Mines in Chilong Mining Area, Bailongshan Street, to select the construction units of mining projects through public bidding. The contracted project includes four sub-projects, namely, the mine project, the Wuxi River Regulation Project, the temporary diversion project of Yunwu Road and the filling project under the bridge of G25 Expressway, with a total construction period of 1275 days (including the capital construction period). The estimated amount of the tender is 800 million yuan.

It is understood that the mining minerals of the mine are sandstone for construction, andesite for construction and granite for construction. The mining area is 2.5255 square kilometers, and the resource reserves are 5406.In February 2023, the project was successfully won by Yunhe County Industrial Investment Economic Development Co., Ltd. with 58.95 million yuan. The deadline for submission of

bidding documents is 9:00 on September 15, 2023.

Yunhe County Bailongshan Street Chilong Mining Area Ordinary Building Stone Mine Comprehensive Development and Utilization Project Bidding Announcement

(Bidding No.: YZT-23GG-001)

1. The project has met the bidding conditions, and now the construction of the project is open bidding.

2. Project overview and bidding scope

2.1 Project overview:

Located in Bailongshan Street, Yunhe County, the Comprehensive Development and Utilization Project of Ordinary Building Stone Mine in Chilong Mining Area, Bailongshan Street, Yunhe County, obtained the Mining License issued by the Department of Natural Resources of Zhejiang Province on March 1, 2023. The owner of the mining right is Yunhe County Industrial Investment Economic Development Co., Ltd., and now it is necessary to select the construction unit of the mining project through public bidding. The project includes four sub-projects, as follows:

Sub-project 1 (Mining Project): The mining area of this project consists of 54 turning point, covering an area of 2.5255 km2. The mining elevation is + 315.17 m ~ + 178. It is mainly used for filling within the scope of the project and shall not be transported outward. The total excavation volume of the project is 22.1647 million cubic meters, and the actual available filling volume is 25.3728 million cubic meters based on the replacement coefficient of 0.94 ~ 1.3 for different types of rocks and topsoil; the total filling volume required by the site is 2661. Two lines B and C of infrastructure roads are set within the mining area, with the total length of line B being 1986 m and the total length of line C being 1193 m. For details, refer to the design of safety facilities, the design of construction drawings for lines B and C of capital construction, and the design of construction drawings for earthwork.

Sub-item 2 (Wuxi River Regulation Project, hereinafter referred to as "Water Conservancy Project"): in combination with the ecological product value of Yunhe County, realize the adjustment of the planning and design scheme of the demonstration area, comprehensively raise the bottom elevation of the Wuxi River, and according to the terrain and plot planning after the renovation, adjust the horizontal and vertical section design of the Wuxi River. According to the calculation results of flood control and water conservancy, the river width is controlled by 27 m. For details, see the construction drawing design of Wuxi River.

Sub-item 3 (Temporary Diversion Works of Yunwu Road): 3 temporary access roads are set up to facilitate villagers' travel along the line. The total length of the access roads is 1. It is constructed according to the standard of two-lane four-level highway stipulated in the Code for Design of Highway Route (JTG D20-2017), with a design speed of 20 km/H. Subgrade width 6.

Sub-item 4 (Filling works under the bridge of G25 Expressway Heshang Bridge): This project involves the leveling and backfilling of the sites on both sides of the bridge at K61 + 157 ~ K61 + 700 section of G25 Changshen Expressway Heshang Bridge, and the piers under the bridge need to be backfilled and buried. The current ground elevation at the bottom of the bridge is 156 ~ 157 m. The design backfilling elevation is 167m, and the maximum design filling height of the project is estimated to be 11m. The filling and excavation design of the block site shall be carried out in accordance with the requirements of the Code for Design of Subgrade (JTG D30-2015) and other specifications; the No.19 ~ 21 pier column sections under the bridge on the river shall adopt the combined design scheme of pile-sheet wall + light material + slope protection; The "foam concrete protection" scheme is adopted for the site backfilling of other pier column sections. For details, see the construction drawing design of the filling works under the G25 Expressway River Bridge.

2. 74352 of construction and installation cost in this tender.

2.3. Qualification requirements for

bidders (1) Bidders:

3.1 Must have the qualification of general contracting of mining engineering at or above the first level and water conservancy and hydropower at the same time. Qualification of Grade II or above for general contracting of engineering construction; 3.22 Have valid enterprise safety production license (in case of consortium bidding, all members must have it), and the main person in charge of the enterprise (legal representative, enterprise manager, deputy manager in charge of safety production of the enterprise, technical director of the enterprise) has Class A certificate of full-time safety production management personnel (in case of consortium bidding, all members must have it); 3.3

The bidder (the consortium refers to the leader of the consortium) has a valid safety production license for non-coal mining enterprises issued by the emergency management department; 3.3

. Consortium bidding shall meet the following requirements:

(1) Each party of the consortium shall sign a consortium agreement to specify the rights and obligations of the consortium leader and each party;

(2) The leader of the consortium must have the qualification of Grade I or above for general contracting of mining engineering construction, and the number of members of the consortium (including the leader) shall not exceed 2.

(3) The parties to the consortium shall not bid in their own names or participate in other consortia in this bidding project.

(II) Person in charge of the proposed project:

3. It has been entered in the "Zhejiang Construction Market Supervision Public Service System". If the person in charge of the proposed project has no project under construction or pre-winning project, if there is any other contract project under construction on the deadline for bidding (the start time of the contract project under construction is the date of issuing the notice of winning the contract project, or the date of signing the contract is the start time if the bidding method is not adopted. The person in charge of the project (including the person in charge of construction in the general contracting project) shall not participate in the bidding as the person in charge of the proposed project;

3.

(III) Others:

3.8 The person in charge of the safety of the proposed mining project has the qualification of registered safety engineer registered in the bidder's unit (in case of consortium bidding, it must be appointed by the leader of the consortium, the same below) and has the technical title of engineer or above;

3.);

3.10 The proposed construction site quality personnel, construction personnel, material personnel and data personnel of the mine project shall hold relevant training certificates for construction site management personnel; 3.11 The "three types of personnel" (the main responsible person of the enterprise, the project responsible person and the full-time safety production management personnel) of the bidder of the

mine project (the leader of the consortium) must hold the certificates of safety production assessment (A, B and C certificates) issued by the provincial competent authorities. Among them, the manager of the enterprise, the technical director of the enterprise and the deputy general manager in charge of safety production of the enterprise shall have appointment documents, and shall not serve concurrently with other key personnel of the proposed project team; 3.1212 Full-time safety production management personnel are proposed to be assigned to the construction site of the mine project, with Class C certificates of full-time safety production management personnel, and no less than 3 full-time safety production management personnel. The number of employees shall meet the provisions of the Measures for the Establishment of Safety Production Management Organizations and the Allocation of Full-time Safety Production Management Personnel of Construction Enterprises (JZ [2008] No.91) issued by the Ministry of Housing and Urban-Rural Development;

3. The original of the three-month social insurance certificate shall be provided (for three consecutive months from March 2023, the electronic inquiry of the new version of the QR Code shall have the same effect as the original) (the tenderer shall be established for less than three months, and the social insurance certificate from its establishment to the deadline for bidding shall be provided);

3. At the deadline of bidding, he shall not act as the project manager in any other contract project under construction (including the construction manager in the general contracting project). The start time of the contract project under construction is the date when the notice of award of the contract project is issued (if the bidding method is not adopted, the start time is the date when the contract is signed), and the end time is the date when the contract project passes the acceptance or the contract is terminated;

3.); 3.16 The safety officer, quality inspector and construction worker of the proposed

water conservancy project shall hold the national water conservancy and hydropower project construction site management personnel training certificate issued by China Water Conservancy Association or China Water Conservancy Enterprise Association;

3.17 The "three categories of personnel" (the principal person in charge of the enterprise, the person in charge of the project and the full-time safety production management personnel) of the bidder of the water conservancy project (the member of the consortium) must hold the certificates of safety production assessment (A, B and C certificates) issued by the water administration department at or above the provincial level. The manager of the enterprise, the technical director of the enterprise and the deputy general manager of the enterprise in charge of safety production shall have appointment documents; there shall be no less than three full-time safety production management personnel, and they shall not serve concurrently with other key personnel of the proposed project team; 3.18 The main personnel of the proposed project team of the

water conservancy project (referring to the person in charge of the water conservancy project, the technical person in charge of the water conservancy project, the full-time safety production management personnel, the safety officer, the quality inspector and the construction worker) must have been publicized on the application of the "transparent project" of the Water Conservancy Department of Zhejiang Province;

3. The original of the three-month social insurance certificate shall be provided (for three consecutive months from March 2023, the electronic inquiry of the new version of the QR Code shall have the same effect as the original) (the tenderer shall be established for less than three months, and the social insurance certificate from its establishment to the deadline for bidding shall be provided); 3.3.21

The bidder (the consortium refers to the leader of the consortium) and the person in charge of the proposed project are not included in the list of serious dishonesty in the construction market (subject to the national and Zhejiang construction market supervision and integrity information release platform); 3.22

□ The bidder and the person in charge of the proposed project are not included in the blacklist of dishonesty in tendering and bidding (subject to the blacklist of dishonesty published by the Development and Reform Commission of Zhejiang Province during the disclosure period); 3.23

The bidder (the consortium refers to the leader of the consortium) and the person in charge of the proposed project have no criminal record of bribery from January 1, 2020 to the date of publication of the tender announcement of this project (subject to the inquiry results of China Judicial Documents Network); 3.24

The bidder (the members of the consortium) and its proposed "three categories of personnel" and the main personnel of the proposed project team are not included in the "blacklist" of the credit platform of the national water conservancy construction market; 3.2525 The bidder (the parties of the consortium) has not been included in the list of serious dishonest subjects by the "Credit China" website (https://www.creditchina.gov.cn). Not by the website of "China Executive Information Open Network" (https://zxgk.court.gov.4.

bidding method

4.5. Acquisition

of bidding documents 5.1 Bidding documents (including drawings) and supplements (Q & A) of this project Clarification) and modification documents shall be distributed in the form of downloading from the Internet; "Lishui City Public Resources Trading Website (Website: https://lssggzy.lishui.gov.5.2

Bidding Documents Download Website: Potential Bidders Login" Lishui City Public Resources Trading Website (Website: https://lssggzy.lishui.gov.0HTML0 UNK1 35. If the bidder fails to bid due to his own delay, he shall be responsible for it. 0 HTML0 https://lssg 45.0 HTML0 https://lssg 56. Submission of bidding documents 0 HTML0 https://lssg 66.0 HTML0 https://lssg 77.0 HTML0 https://lssg 88. Media of announcement 0 HTML0 https://lssg 9. This tender announcement is published in Lishui Public Resources Trading Network (https://lssg Gzy. Lishui. Gov. 0 HTML 0 5113431 0 Industry administrative supervision department: Yunhe County Natural Resources and Planning Bureau (Tel: 0578-UNK2; mailing address: No.77, Zhongshan West Road, Yunhe County).

All can be viewed after purchase
Correlation

Yunhe County, Lishui City, Zhejiang Province, issued the Tender Announcement for the Comprehensive Development and Utilization Project of Ordinary Building Stone Mine in Chilong Mining Area, Bailongshan Street.

2023-08-25 09:24:05

These projects will inject strong impetus into Zhejiang's economic development and bring new opportunities to the sand and gravel industry.

2023-07-05 14:04:54

Actively explore and promote the deepening of the comprehensive utilization and management of sand and gravel resources, make every effort to build a strong water ecological security barrier in the whole region, and plant a green ecological background for development.

2023-03-08 11:27:36

On September 9, Huaxin held a semi-annual performance conference in Wuhan in 2025. President Li Yeqing, Vice President and Chief Financial Officer Chen Qian, Vice President and Secretary of the Board of Directors Ye Jiaxing attended the event as exchange guests.