the COP28 conference, the signing ceremony of the EPC contract for the Round 4 Photovoltaic Project-AHK 1100 MW Photovoltaic Power Plant in Saudi Arabia was held.
Recently, Tang Yuhua, General Manager of Power Construction International, went to the United Arab Emirates to attend the 28th Conference of the Parties to the United Nations Framework Convention on Climate Change (hereinafter referred to as COP28). During the event, Tang Yuhua attended the signing ceremony of EPC contract for Round 4 Photovoltaic Project-AHK 1100 MW Photovoltaic Power Station in Saudi Arabia.
The data show that China Electric Power Construction has a registered capital of 31.9 billion yuan, with 180000 employees and business and institutions in more than 130 countries and regions around the world. It is the leader of global clean and low-carbon energy, water resources and environmental construction, the backbone of global infrastructure interconnection, and the leading enterprise serving the construction of "the Belt and Road". In the field of engineering, it can provide global customers with integrated services of investment and financing, planning and design, construction contracting, equipment manufacturing, management and operation of the whole industrial chain, and a package of overall solutions.