On August 11, Xiangdong Branch of Pingxiang Natural Resources and Planning Bureau announced that the mining right of limestone mine for building stones in Shangcun Mining Area, Baizhu Township, Xiangdong District, Pingxiang City, Jiangxi Province would be sold for 11.8 years at a starting price of 75 million yuan. The mining area of the
project is 0.2873 square kilometers, with a resource reserve of 30.8708 million tons.
Listing time: September 14, 2023-September 28, 2023 & nbsp; Starting and ending time
of application: August 14, 2023-September 26
, 2023 Pingxiang City is located in the junction of Yangtze Plate and Huaxia Plate, rich in mineral resources and has a long history of mining development.
Pingxiang Mineral Resources Master Plan (2021-2025) points out that by 2025, the total annual mining volume of the city is expected to be 16 million tons, the total number of mines is expected to be 100, and the proportion of large and medium-sized mines will reach 24%.
In view of the mining right of sand, gravel and soil, the Master Plan of Mineral Resources of Pingxiang City (2021-2025) clearly States that it is necessary to actively carry out the "net ore" transfer of the mining right of sand, gravel and soil, explore and promote the "net ore" transfer of other minerals, strengthen the preparatory work for the transfer of net ore, optimize the transfer process and improve the level of service guarantee; Strengthen supervision and inspection to further improve the level of "net ore" transfer.
Each county (district) shall, according to different resource endowments, environmental carrying capacity, market demand, transportation radius and other conditions, reasonably determine the total amount control of sand and gravel mining rights in the area, the minimum mining scale access, and invest sand and gravel mining rights in an orderly manner; actively guide the areas with conditions to delimit centralized mining areas, and promote the scale development of sand and gravel resources; Combine the development and utilization of resources with the protection of the ecological environment of mines, scientifically and rationally set up mining rights, do not take the ridge line as the mining boundary, and do not divide or partially set up mining rights if they can be developed as a whole; actively promote the net transfer of mining rights, strengthen supervision and inspection, and further improve the level of "net transfer"; Strictly implement the principle of "mining while restoring", promote the ecological restoration of mines, and build new mines according to green mine standards. During the
planning period, the production scale of new construction stone mines shall not be less than 500000 tons per year, and the service life of mines shall not be less than 10 years in principle. In the centralized mining area, we will actively promote the construction of mines with reserves of more than 15 million tons and production scale of more than 1 million tons per year. By 2025, the annual production capacity of building stones will reach 5 million tons.
According to the regional resource conditions, environmental carrying capacity, market demand and transportation logistics, and in accordance with the principles of protection priority, rational development and intensive economy, the policy of transferring the mining rights of building stones needed for machine-made sand is reasonably determined to ensure the supply of raw materials for machine-made sand. On the premise of ensuring product quality and ecological safety, we should encourage the use of mine tailings and waste rocks to produce machine-made sand, save resources and improve the level of comprehensive utilization of mine solid waste. By 2025, the total amount of machine-made sand for building stones and machine-made sand for waste stones in the city will reach about 3 million tons.