China Construction West Construction Southwest Co., Ltd. won 455,000 square meters of large projects

2023-04-19 16:30:32

The total length of this section is 22.76 kilometers. It includes the main line bridge from the city to the airport, the main line bridge from the airport to the people's university, the hub around the city and the airport.

As the demarcation point between the expressway network and the urban road network,

the project crosses the expressway around the city and the Chengdu-Mianyang-Leshan passenger dedicated line to the south, uses the existing logistics Avenue, Huangjia Avenue and Xihanggang Avenue to lay viaducts after passing through the east side of Shuangliu Airport, and successively crosses several municipal roads such as Dajian Road, Muhua Road and Zhenggong Road. The total length of this section is 22.76 kilometers. It includes the main line bridge from the city to the airport, the main line bridge from the airport to the people's university, the hub around the city and the airport.

All can be viewed after purchase
Correlation

The total length of this section is 22.76 kilometers. It includes the main line bridge from the city to the airport, the main line bridge from the airport to the people's university, the hub around the city and the airport.

2023-04-19 16:30:32

Hardened gear reducers for cement industry Part 3: Kiln reducers; Test method for expansion of coarse aggregate for concrete; Silica aerogel powder for mortar; Terminology of alkali-activated cementitious materials; Test method for compatibility of cement and water reducing agent; Concrete block and concrete brick masonry mortar; Decorative concrete block are included in the plan of upgrading traditional industrial standard projects.