2023, Hubei Public Resources Property Rights Trading Network listed two sand and gravel mines for sale.
1. Limestone mine for building stones in Zhangjiachong Mining Area, Yidu City: The mining area is located in Zhangjiachong Village and Youzhaping Village, Yaojiadian Town, Yidu City. The total amount of limestone resources for building stones in Zhangjiachong Mining Area is 3000 tons 19982, with a production scale of 9 million tons per year. The proposed transfer period is 22. The cost per ton is about 1 yuan.
According to the transfer announcement, the bidder must pay the infrastructure fee related to the mining right to the special financial account designated by the Yidu Municipal People's Government. The relevant fees
for the preliminary stage of the transfer of the mining right shall be paid to the special financial account designated by the People's Government of Yidu City before December 31, 2023. 1.2. Dolomite Mine for Construction in Miaochong Mining Area of Yicheng City: The mining area is located in Group 5/6, Dongwan Village, Banqiaodian Town, Yicheng City, Xiangyang City, Hubei Province, with a resource reserve of 87.015 million tons.
According to the transfer announcement, the local government organized geological exploration, relocation of wind turbines, vegetation compensation and other work, with a total cost of 466718 44 yuan. After the transaction, the bidder must pay into the designated account of the Non-tax Revenue Administration Bureau of Yicheng Municipal Government within five working days.
I. Basic Information on
the Transfer of Mining Right (I) Project Name: Mining Right of Limestone Mine for Building Stone in Zhangjiachong Mining Area, Yidu City.".
(II) Mining minerals: limestone for building stones.
(III) Location: Located in Zhangjiachong Village and Youzhaping Village, Yaojiadian Town, Yidu City, about 9 km away from Yidu City.
(IV) Mining scope: The mining area is 0.7193 square kilometers
(V) Resource reserves: According to the Exploration Report on Limestone for Building Stones in Zhangjiachong Mining Area, Yidu City, Hubei Province, by the end of October 2022, In Zhangjiachong Mining Area, the accumulative proven resources of limestone for building stones are 19982, of which the proven resources are 61.62 million tons, the indicated resources are 98.571 million tons, and the inferred resources are 3963.
(VI) Production scale: 9 million tons/year.
(VII) Proposed transfer term: 22.
(VIII) Development and utilization plan: The mining method is open-pit mining, the development method is road transportation, and the mining recovery rate is 95%. The recoverable reserves are 18573.
II. Transfer Method
The mining right shall be transferred by means of online application, online quotation and online bidding.
3. Qualifications and requirements
of bidders (1) Bidders must be registered within the territory of the People's Republic of China and have independent legal personality. Natural persons and consortia are not accepted to bid, and bidders and payers of bidding related fees must be the same legal entity.
(2) Bidders must have good corporate reputation, performance ability, no bad credit record, and not be included in the abnormal list of the mining right holder's exploration and mining publicity system. Bidders must provide a bank credit certificate of 100 million yuan issued by the bank, provide a record of no bad behavior on the "Credit China" website and download and stamp the official seal.
(3) The bidder shall pay the infrastructure fees related to the mining right to the special financial account designated by the People's Government of Yidu City. 6. After the bidding is completed, 20% of the fees shall be paid before December 31, 2023, i.e. 114.2 million yuan, and 40% of the fees shall be paid before December 31, 2024, i.e. 228.4 million yuan; Pay 40% before December 31, 2025. That is, 2.
(4) After winning the mining right, the bidder shall pay 161 million yuan to the special financial account designated by the Yidu Municipal People's Government before December 31, 2023 (including about 86 million yuan for land requisition and relocation). The cost of house requisition and relocation is about 0.
(5) After winning the mining right, the bidder shall strictly follow the green mine construction norms, carry out the green mine construction work, and meet the green mine standards within one year after the mine is completed and put into operation.
(6) In order to effectively strengthen the management of sand and gravel resources, according to the relevant work guidance and the principle of "government-led and state-owned enterprise operation", bidders must reach a cooperation agreement with Yidu Guotong Investment and Development Co., Ltd. within 15 working days after winning the mining right to jointly develop mineral resources. And actively increase research on the development and utilization of non-metallic mineral resources, extend the industrial chain, and expand related industries.
(7) After winning the mining right, the bidder shall adopt the corridor to transport mineral products according to the planning and construction plan of the project. Initial
listing price, range of price increase and bid security deposit
(I) The initial listing price for the transfer of the mining right is RMB one hundred and ninety-five million yuan only (in figures: RMB 195,000, 000. This online listing transfer of mining rights determines the bidder according to the principle of "not lower than starting price and the highest price wins".
(2) The range of price increase for quotation and time-limited bidding shall be RMB 500,000 yuan or an integral multiple of RMB 500,000 yuan.
5. The listing transfer document obtains
the mining right listing transfer in the mining right online trading system of Hubei Public Resources Auction Trading Network (https://www.hbggzypm.
VI. Relevant time requirements
(1) Announcement time: August 7, 2023 to September 1, 2023;
(2) Deadline for submission of qualification materials: 17:00 on September 14, 2023;
(III) Starting and ending time of online listing: from September 4, 2023 to 10:00 on September 18, 2023;
(IV) If there are more than 2 (including 2) bidders' quotations before the listing deadline, the system will automatically enter the time-limited bidding procedure at the listing deadline, and the time-limited bidding is not subject to the listing deadline.
Yidu City Natural Resources and Planning Bureau
August 7
, 2023 Yicheng City Miaochong Mining Area Construction Dolomite Mining
Right Online Listing Transfer Announcement
Xiangkuang Wangguan [2023] No.02 0 HTML0U NK40, in accordance with the relevant laws and regulations such as the Mineral Resources Law and the Rules for the Transfer and Transaction of Mining Rights (No.2023), and with the approval of the Yicheng People's Government, the Yicheng Natural Resources and Planning Bureau entrusted the Yicheng Public Resources Trading Center to publicly transfer the construction of Miaochong Mining Area in Yicheng City by listing on the Internet. Relevant matters are hereby announced as follows: 0HTML0 UNK4 1 I. The name of the transferor and the mining right trading platform, Venue 0 HTML0 UNK4 2 (I) Assignor: Yicheng Natural Resources and Planning Bureau 0 HTML0 UNK4 3 Office Address: No.318, Zhenxing Avenue, Yicheng City 0 HTML0 UNK4 4 (II) Mining Rights Trading Platform: Yicheng Public Resources Trading Center 0 HTML0 UNK4 5 Office Address: No.38, Zhonghua Road, Yicheng City 0 HTM L0 UNK4 6 (III) Mining Right Trading System: Mining Right Online Trading System of Hubei Public Resources Property Rights Trading Network (https://www.hbggzypm.).Name of
mining right: The transferred mining right is "Mining Right of Dolomite Mine for Construction in Miaochong Mining Area, Yicheng City", located in Group 5/6, Dongwan Village, Banqiaodian Town, Yicheng City, Xiangyang City, Hubei Province, with a transfer period of 17.4 years (calculated from the date of obtaining the mining license). The mining minerals are dolomite for construction, and the mining method is open-pit mining, with a mining scale of 5 million tons per year. Mining area 0.
(II) Resource reserves: According to the Review Opinion on Mineral Resource Reserves of the Exploration Report on Dolomite Mine for Construction in Miaochong Mining Area, Yicheng City, Hubei Province, The Plan for the Development and Utilization of Mineral Resources and Ecological Greening of Dolomite Mine for Construction in Miaochong Mining Area, Yicheng City, Hubei Province and the Income Assessment Report on the Transfer of Mining Rights of Dolomite Mine for Construction in Miaochong Mining Area, Yicheng City (Xin Zhi Kuang Ping Bao Zi [2023] No.033) have a resource reserve of 87.015 million tons and a recovery rate of 95%. The recoverable reserves are 8,178.
III. Transfer documents and access
to the transfer documents of the mining right by listing include the Announcement on Online Listing Transfer of the Mining Right of Dolomite Mine for Construction in Miaochong Mining Area of Yicheng City and the Notice on Bidding for Online Listing Transfer of the Mining Right of Dolomite Mine for Construction in Miaochong Mining Area of Yicheng City and its annexes. The listing transfer of mining rights is carried out in the online trading system of mining rights of Hubei Public Resources Property Rights Trading Network (https://www.hbggzypm.
IV, bidding margin, transfer mode, starting price, price increase range, etc.). Proof of
funds (I) Bid deposit: sixty million yuan ( ¥60 million yuan).
(II) This transfer of mining right is online listing without base price, and the initial listing price is RMB eighty-eight million five hundred and eighty thousand yuan only (¥ 88.58 million yuan).
(3) The range of price increase is one million yuan or an integral multiple of one million yuan.
(IV) Capital certificate: the capital deposit certificate (original) issued by the bank after paying the bid security deposit of 60 million yuan and not less than 70 million yuan.
5. Relevant time requirements
(1) Announcement time: August 7, 2023 to September 6, 2023;
(2) Deadline for submission of qualification review: 17:00 on September 19, 2023;
(III) Starting and ending time of online listing: from 8:30 on September 7, 2023 to 10:00 on September 22, 2023;
(4) If there are more than two (including two) bidders'quotations before the deadline of listing, the system will automatically enter the time-limited bidding procedure at the deadline of listing, and the time-limited bidding is not subject to the deadline of listing.
6. Risk warning and matters
needing attention (1) Due to the complexity of geological conditions and the limitations of exploration work, the resource reserves within the mining area of the transfer of mining rights may be different from the actual situation, and the bidder shall voluntarily bear the risk. No request for refund, claim or extension of the mining period shall be made to the relevant departments of natural resources on the grounds of mineral resources reserves, mining conditions and force majeure factors.
(II) In order to transfer the mining right this time, the local government organized and carried out geological exploration, relocation of wind turbines, vegetation compensation and other work, with a total cost of forty-six million six hundred and seventy-one thousand eight hundred and forty-four yuan only ( ¥46671844). After the listing is completed, the bidder shall pay the designated account of the Non-Tax Revenue Administration Bureau of Yicheng Municipal Government within five working days after the announcement of the transaction results without objection. Those who fail to pay the above-mentioned fees within the time limit shall be deemed to have automatically abandoned the mining right and shall bear all legal liabilities, and the bid bond paid shall not be refunded.
(3) The bid margin for the transfer of mining rights is 60 million yuan ( ¥60 million yuan). From 8:30 on September 7, 2023 to 17:00 on September 19, 2023, pay to the designated account of Yicheng Public Resources Trading Center (payee: Yicheng Public Resources Trading Center, bank of deposit: Yicheng Branch of Hubei Bank Co., Ltd., account number: 12130280000000084), subject to the actual time of account arrival. The bidder shall directly transfer the proceeds from the transfer of mining rights within five working days after signing the contract for the transfer of mining rights with the Natural Resources and Planning Bureau of Yicheng City. The bid margin of other bidders shall be refunded within 5 working days of the transaction (without interest).
(4) There may be policy and legal risks in the land, forest land, safety, environmental protection, water conservancy and access roads within and around the mining area of this transfer of mining rights, which shall be settled by the bidder through consultation with the relevant obligees, and the expenses incurred shall be borne by the bidder. If the mining cannot be carried out due to the failure of self-negotiation, the bidder shall bear all legal liabilities and economic losses.
浙公网安备33010802003254号