On August 2, the People's Government of Shangrao City, Jiangxi Province, issued a public announcement on the proposed approval
of the environmental impact report of Shangrao Jingke Energy Intelligent Manufacturing Co., Ltd. JinkoSolar plans to build a project with an annual output of 26 GW silicon wafer diamond wire slices in Shangrao, with a total investment of 163685 million yuan and an area of 238901.
The project has been accepted and publicized before approval, and no unit or individual has objected to the construction of the project.
The publicity period is from August 2, 2023 to August 8, 2023 (5 working days).
The original text is as follows:
Announcement
on the Proposed Approval of the Environmental Impact Report of the Annual Output of 26 GW Silicon Wafer Diamond Wire Slice Project of Shangrao Jingke Energy Intelligent Manufacturing Co., Ltd. Our Bureau intends to give approval opinions on the annual output of 26 GW silicon wafer diamond wire slicing project of Shangrao Jingke Energy Intelligent Manufacturing Co., Ltd. In order to ensure the seriousness and impartiality of the review, the basic information of the environmental impact assessment documents of the project is now publicized. The publicity period is from August 2, 2023 to August 8, 2023 (5 working days) . Notice of
hearing: According to the Administrative License Law of the People's Republic of China, the applicant and interested party may request a hearing on the following approval opinions on the EIA documents of the construction project to be made within five days from the public announcement.
Tel: 0793-8316059
Address: West Side of Guangping Street, Shangrao Administrative Center Email
: srjgk@163.com Project Name
: Annual Output of 26 GW Silicon Wafer Diamond Wire Slice Project of Shangrao
JinkoSolar Intelligent Manufacturing Co., Ltd. Construction Location
: 0 HTML0U NK20 No.3 Yingbin Avenue, Ma'anshan Area, Shangrao Economic and Technological Development Zone 0 HTML0 UNK2 1 Construction Unit 0 HTML0 UNK2 2 Shangrao Jingke Energy Intelligent Manufacturing Co., Ltd. 0 HTML0 UNK2 3 Environmental Assessment Organization 0 HTML0 UNK2 4 Jiangxi Dezheng Environmental Technology Co., Ltd. 0 HTML0 UNK2 5 Project Overview 0 HT ML0 UNK2 6 Shangrao Jingke Energy Intelligent Manufacturing Co., Ltd. is located at No.3, Yingbin Avenue, Ma'anshan District, Shangrao Economic and Technological Development Zone (central geographic coordinates: 117 ° 50 ′ 55.440 ″ E, 28 ° 21 ′ 26.058 ″ N). The total floor area of the project is 238901. The product scheme of the project is: 0 HTML 0 UNK2 7 with an annual output of 26 GW monocrystalline silicon wafers and 94 tons of supporting guide wheels. 0 HTML0 UNK2 8 total investment 163685 of the project 0 HTML0 UNK2 9 main raw and auxiliary materials of the project: (1) monocrystalline silicon rod, industrial anhydrous alcohol, dust-free paper for wiping, stick glue, hollow board, preservative film, cutting fluid, diamond wire, degumming agent, agent a for cleaning machine, cleaning agent B, ammonium fluoride, Hydrogen peroxide, sodium hydroxide, 30% hydrochloric acid, lime, calcium chloride, PAC, PAM, lye, solid PAC, flake caustic soda, etc.; (2) The guide wheel of the slicer is made of polyurethane system material, polyurethane rubber vulcanizing agent, isopropanol, adhesive, putty, calcium carbonate, styrene, barium, release agent, white corundum sand, iron core, mold, absolute ethanol for wiping, dichloromethane, non-woven fabrics, etc. 0 HTML0 UNK3 0 The main production processes of the project are as follows: (1) Silicon wafer diamond wire slicing: including wiping, stick sticking, slicing, degumming, wafer cleaning, electric drying, inspection, packaging and other processes; (2) Slicer guide wheel: including sandblasting, wiping, coating, preheating, casting, cleaning, natural cooling, slotting and other processes. 0 HTML0 UNK3 1 Main environmental impacts and countermeasures and measures to prevent or mitigate adverse environmental impacts 0 HTML0 UNK3 2 1. Waste gas pollution prevention and control measures 0 HTML0 UNK3 3 Clean production measures should be taken to reduce the amount of waste gas. According to the category and nature of the pollutants in the waste gas, a mature and reliable process is adopted for treatment. Ensure that the waste gas pollutants are subject to the requirements of the Environmental Impact Assessment (EIA) in accordance with the Emission Standard of Volatile Organic Compounds Part 4: Plastic Products Industry (DB36/T1101.0 HTML0 UNK3 42 and the Prevention and Control Measures of Waste Water Pollution 0 HTML0 UNK3 5. Reasonably formulate wastewater collection and treatment schemes. The wastewater of the project mainly includes production wastewater (including slice wastewater, degumming wastewater, slice cleaning wastewater), pure water preparation concentrated water, waste gas spraying wastewater, domestic sewage and mop cleaning wastewater. The concentrated water prepared by pure water, domestic sewage treated by oil separation tank and septic tank, mop cleaning wastewater and self-built sewage treatment station (hydrolysis acidification + A/O + sedimentation) in the plant area are discharged into the main outlet of the enterprise sewage treatment station. The concentration of wastewater discharged outside the plant area and the benchmark discharge of unit product shall comply with the indirect discharge standard of solar cell in Table 2 of the Discharge Standard of Pollutants for Battery Industry (GB30484-2013) and the takeover standard of the sewage treatment plant in Shangrao Economic and Technological Development Zone, and shall be discharged into the sewage treatment plant in Shangrao Economic and Technological Development Zone for advanced treatment through the sewage pipe network in the park. 0 HTML0 UNK3 63, Noise Pollution Prevention and Control Measures 0 HTML0 UNK3 7 The noise of the project mainly comes from production equipment such as sandblasting machine, pouring machine and slicing machine. Low-noise equipment shall be selected, and measures such as noise elimination, shock absorption and sound insulation shall be taken to reduce the impact of noise at the plant boundary on the environment. The noise values at the east, south and west of the plant boundary in the daytime and at night can be controlled within the scope of Class III standard in the Emission Standard for Environmental Noise at Boundary of Industrial Enterprises (GB12348-2008). The daytime and nighttime noise values in the north of the plant boundary can be controlled within the Class 4 standard range of the Emission Standard for Industrial Enterprises Noise at Boundary (GB12348-2008), and the daytime and nighttime noise values of the surrounding sensitive points can be controlled within the Class 2 standard range of the Emission Standard for Industrial Enterprises Noise at Boundary (GB12348-2008). 0 HTML0 UNK3 84, Solid Waste Pollution Prevention and Control Measures 0 HTML0 UNK3 9 Strictly implement the relevant procedures for hazardous waste transfer. Hazardous wastes that cannot be comprehensively utilized shall be regularly entrusted to qualified units for treatment and disposal; general industrial solid wastes shall be reasonably disposed of and shall not cause pollution to the surrounding environment. Unqualified silicon rods and wafers of the project are sold to the manufacturer after collection; waste sand, waste wiping cloth, waste leftover materials, waste wiping paper, waste plastic film, waste guide wheel, waste diamond wire, silicon powder, waste hollow board, waste packaging bags, sludge and other general solid wastes are sold for comprehensive utilization; waste packaging barrels and waste oil barrels are recycled by the manufacturer; Waste activated carbon, waste cleaning solvent, waste vacuum pump oil, waste guide rail oil, waste hydraulic oil, etc. shall be collected by classification and entrusted to qualified units for treatment and disposal; domestic garbage shall be collected and handed over to the environmental sanitation department for unified treatment. Standard for Pollution Control on Storage and Landfill of General Industrial Solid Wastes (GB18599-2020) shall be implemented for general solid wastes, and Standard for Pollution Control on Storage of Hazardous Wastes (GB18597-2023) shall be implemented for hazardous wastes. 0 HTML0 UNK4 05. Strictly implement measures to prevent and control groundwater and soil pollution. 0 HTML0 UNK4 1 According to the principle of combining "source control, zoning prevention and control, pollution monitoring and emergency response", the generation, infiltration, diffusion and emergency response of pollutants are controlled. Corresponding anti-corrosion and anti-seepage treatment shall be carried out for key anti-seepage areas such as slicing workshop, slotting workshop, chemical warehouse, hazardous waste warehouse, sewage treatment station and septic tank. Long-term groundwater monitoring wells shall be arranged in the plant area according to the requirements of the specification, and groundwater monitoring shall be carried out regularly. Formulate corresponding plans, clarify measures such as closure and closure in case of risk accidents, and conduct emergency drills regularly. 0 HTML0 UNK4 26. Standardization requirements for sewage outlets. 0 HTML0 UNK4 3 Set up standard pollutant discharge outlets according to regulations, and set up corresponding signs. Waste water and waste gas discharge pipelines shall be provided with permanent monitoring sampling ports in accordance with the requirements of monitoring technical specifications. 0HTML0 UNK4 47. Strictly implement environmental risk prevention measures. 0HTML0 UNK4 5 Strictly implement various environmental risk provention and control measures, carefully formulate environmental risk contingency plan, and equip environmental emergency facilities and equipment. Once an environmental risk accident occurs, the environmental risk contingency plan must be started immediately to control and reduce the impact of external environmental pollution. 0 HTML0 UNK4 68, Project Surrounding Control Planning Requirements. 0 HTML0 UNK4 7 According to the conclusion of the report, the protection distance of the project is 50 meters outside the boundary of the integrated workshop and the grooving workshop, and 100 meters outside the boundary of the sewage treatment station. Your company shall cooperate with the Management Committee of Shangrao Economic and Technological Development Zone to strictly control the surrounding planning of the project. No new residential buildings, schools, hospitals and other environmentally sensitive buildings shall be built within the health protection distance of the project.The
public participation
project has been accepted and publicized before approval, and no unit or individual has objected to the construction of the project.