On July 28, Yangdong Branch of Yangjiang Natural Resources Bureau announced that the mining rights of granite mine and hornstone mine for construction in Guogailing Mining Area of Red May 10th Team, Yangdong District, Yangjiang City, Guangdong Province, would be sold for 23.5 years at a starting price of 70806.
The mining right is located in the direction of 320 ° in the urban area of Yangjiang City, with a straight-line distance of about 15 kilometers, a mining area of 1.6458 square kilometers and a resource reserve of 71.8658 million square meters.
Listing time: August 25, 2023-September 7, 2023 Starting and ending time of
application: August 25, 2023-September 6, 2023
According to the Digital Building Materials DataBM. Com, The mining right was listed from December 21, 2022 to January 3, 2023.
Yangjiang City is located in the southwest coast of Guangdong Province, close to the Pearl River Delta and the hub of western Guangdong, with convenient land and water transportation. Limestone for cement is mainly distributed in the plain area of Yangchun Basin, with abundant resource reserves, which is conducive to large-scale and intensive development and utilization; Metallic minerals are concentrated in the intersection of Yangchun central tectonic belt, located in Wuchuan-Sihui gold-copper polymetallic metallogenic belt, with good metallogenic geological conditions, great prospecting potential and low degree of development and utilization at present.
Yangjiang Mineral Resources Master Plan (2021-2025) points out that we should further improve the modern mining rights market system, actively promote the transfer of "net ore", improve the relevant supporting systems, give full play to the decisive role of market allocation of resources and better play the role of the government; Cultivate large-scale cement mining groups and building stone production bases, form a large-scale operation pattern, and make the mining economy develop healthily and sustainably. By 2025, the output value of the mining industry is expected to reach 2.8 billion. At the end of the planning period
, the number of quarries in the city will be controlled within 65. It is expected that the production capacity of building stone will be more than 10 million cubic meters per year and that of machine-made sand will be more than 3.25 million cubic meters per year.