The franchise fee is 872.1 million yuan! Bidding for Rooftop Photovoltaic Resources Franchise Project Controlled by Shantou Municipal Government of Guangdong Province

2023-07-26 09:34:37

The designed total installed capacity of this project is kW 204679, and the standard power generation is 10,000 kWh/year 25779.

On July 25, the tender announcement for the franchise project of roof photovoltaic resources controlled by Shantou Municipal Government was issued. The construction sites of the project are the roofs of public buildings controlled by the government in Jinping District, Longhu District, Haojiang District and Chaoyang District of Shantou City, including the existing roof resources. The main construction content of this project is distributed photovoltaic power station, and the corresponding protection, monitoring, maintenance and other supporting facilities are constructed.

According to the surveying and mapping data provided by Shantou Housing and Urban-Rural Development Bureau, the actual roof area within the project area is about 1424332.90 m2, and the available area is 1055048. The building attributes include educational buildings, government units, medical buildings, state-owned enterprises, institutions, etc.

Based on the comprehensive analysis of energy resource utilization, power system supply and demand, project development conditions, project available area and array unit arrangement, the designed total installed capacity of the project is 204,679kW, and the standard power generation is 257.79 million kWh/year . Of which:

the designed total installed capacity of Jinping District is 41,385kW, and the standard power generation is 52.1 million kWh/year;

the designed total installed capacity of Longhu District is 38904 kW, and the standard power generation is 48.94 million kWh/year; The designed total installed capacity

of Haojiang District is 31426 kW, and the standard power generation is 39.8 million kWh/year;

the designed total installed capacity of Chaoyang District is 92964 kW, and the standard power generation is 116.95 million kWh/year. The franchise period of this

project is 30 years in total, starting from the date when the supervising engineer signs the first batch of roof photovoltaic commencement orders. The construction period is 2 years, from the date when the supervision engineer signs the first batch of roof photovoltaic commencement orders to all roofs

The project can be constructed in batches, referring to the distributed photovoltaic projects for the record separately, after the completion of the construction of each roof distributed power station, the project company signs an energy management contract with the power consuming unit, and immediately carries out acceptance and acceptance, and the project company and the power grid enterprise carry out grid-connected acceptance and commissioning, and after the acceptance and commissioning are passed, the project company and the power grid enterprise sign the purchase and sale. Grid-connected dispatching protocol, grid-connected operation. The overall project completes the grid-connected acceptance and commissioning, and enters the operation period after the completion acceptance. The operation period starts from the next day of the completion acceptance to the expiration of the project cooperation period.

Project return mechanism

(1) Project return mechanism

This project is a franchise project. The government transfers the existing roof resources to the franchisee and grants the franchise right of the new roof photovoltaic project. The franchisee pays the franchise fee to the government to obtain the franchise right of the project. After obtaining the right to operate, " the project company will give priority to the use of rooftop photovoltaic power generation by the units within the red line of the rooftop photovoltaic power generation project of this project in accordance with the mode of "self-generation and self-use, balance access to the grid". The electricity price for users can refer to the residential electricity price of Shantou City (applicable to school building roof projects) or the transmission and distribution price policy of provincial power grid in the third regulatory period (applicable to other building roof projects). The details are negotiated between the project company and the users. The project company recovers the cost and obtains reasonable income through power generation income. At the same time, the power grid enterprise shall ensure that the surplus electricity generated on the roof of the project is preferentially connected to the grid and purchased in full.

(2) Shareholder return mechanism

The self-owned funds invested by shareholders are mainly returned reasonably through the profit dividends of the project company and the distribution of the remaining property at the final liquidation of the project company. The project company is solely established by the selected investor, and the selected investor enjoys the profits and surplus property of the project company.

(3) Arrangement

of special financial appropriation and reward and subsidy funds The project company shall provide relevant information on the project and actively assist the government in striving for national, provincial and municipal subsidies, subsidies and financial appropriations. The subsidies, allowances and financial allocations obtained by the Project shall be shared by the Government and the Project Company.

Franchise price

According to the franchise value of the assets and facilities determined in the Assets Appraisal Report on the Market Value of the Franchise Right of Rooftop Photovoltaic Resources Controlled by the Shantou Municipal Government, the franchise price of this project is RMB: 87210. The bidding price of the competing franchisees shall not be lower than this price. The franchise period of this

project is 30 years in total. After the completion and acceptance of the photovoltaic facilities in batches, the batch of facilities can be put into operation until the end of the franchise period. Therefore, if the franchisee can complete the construction and operation of the photovoltaic facilities in advance during the construction period, he can obtain more benefits. This part of income and the risks that may arise in the process of construction and operation shall be considered by the concessionaire to be included in the tender offer when quoting the price of the concession right. Within 30 days after the signing of

the Franchise Agreement (subject to the final time limit agreed by both parties through negotiation), the franchise price shall be paid in full to the account provided by the government in RMB: 87210. In case of overdue payment, the unpaid franchise price shall be taken as the base number from the due date to the date of payment. The interest is calculated according to the LPR of more than 5 years published by the National Interbank Funding Center on the payment date, and the interest is calculated according to the simple interest.

Quality standard

project construction must meet GB50794-2012 Code for Construction of Photovoltaic Power Station, GB50796-2012 Code for Acceptance of Photovoltaic Power Generation Engineering, GB50217 Code for Design of Cables of Electric Power Engineering, GB50052 Code for Design of Power Supply and Distribution Systems, DL/T5137-2001 Technical Code for Design of Electrical Measuring and Energy Computing Devices, Code for Acceptance of Construction Quality of Electrical Engineering in Buildings (GB50303-2015), etc., and achieve one-time acceptance.

The project construction shall comply with the franchise agreement and its supplementary contract, the completion acceptance specifications of governments at all levels and the latest relevant construction standards at that time. The 188545 of the

project is 0.27 million RMB yuan. Of which, the cost of franchise transfer is 87210 million yuan (the cost of franchise transfer in Jinping District is 17640 million yuan, the cost of franchise transfer in Longhu District is 16570 million yuan, the cost of franchise transfer in Haojiang District is 13380 million yuan, Chaoyang District franchise transfer fee is 39620. The construction investment per kilowatt of the project is 4557.

The source and composition of the funds are 100% of

the self-raised funds of the franchisee. The project adopts the franchise mode and the operation mode of "transfer-operation-transfer and construction-operation-transfer". The implementing agency transfers the stock roof resources controlled by the Shantou Municipal Government to the concessionaire, and the concessionaire obtains the franchise to use the roof resources to construct and operate photovoltaic projects, and pays the franchise fee to the government; The concessionaire uses the stock of roof resources to invest in the construction and operation of roof photovoltaic projects, and obtains operating income. After the expiration of the period, the concessionaire transfers the roof resources and roof photovoltaic projects to the implementing agencies or government designated departments free of charge and in good condition. Completion of

preliminary work Requirements for tenderers for relevant preparatory work

completed I. Qualification conditions for bidding applicants:

1.1.1

. Major illegal records. It means that the bidder is subject to criminal punishment or administrative punishment such as ordering the suspension of production or business, revoking the license or license, and imposing a large amount of fines due to illegal operation. (According to the Treasury [2022] No.3 document, "a relatively large amount of fines" is determined to be a fine of more than 2 million yuan. If the standard of "a relatively large amount of fines" in relevant fields is higher than 2 million yuan as clearly stipulated by laws, administrative regulations and relevant departments of the State Council, such provisions shall prevail).

1. Provide a written statement in the format of the Bidder's Statement attached to the tender announcement.

1. Provide a written statement in the format of the Bidder's Statement attached to the tender announcement.

1.6 It is not listed in the "Credit China" website (.cn) "Dishonest Executed Person or Major Tax Violation and Dishonest Subject" record list or is not listed in the "China Executive Information Disclosure Network (https://zxgk.court.gov.)", which is published by the agency on the "Credit China" website (.cn) or the "China Executive Information Disclosure Network ( https://zxgk.court.gov.

1.

Qualification review method:

post-qualification review. The bid evaluation committee established by the tenderee shall review the qualification of the bidder after the bid opening.

Bid evaluation method: "comprehensive scoring method".

Bidding documents acquisition and query method:

1 Bidding documents acquisition time: July 25, 2023 to July 31

, 2023 2 Bidding documents acquisition place: Those who intend to participate in the bidding, please within the specified time (excluding statutory public holidays, statutory holidays). From 9:30 a.m. to 11:30 p.m. and from 14:30 p.m. to 16:30 p.m. (Beijing time, the same below) every day, the bidding registration shall be conducted at Shantou Public Resources Trading Center (3rd Floor, Building 1, Taian Yujing Jiangnan Garden, 37 Huanghe Road, Longhu District, Shantou City) with the following information. All materials to be submitted on site shall be in duplicate:

(1) Application Form for Bidding Registration (see the attachment of this announcement for the format);

(2) Valid Business License, the copy of which shall be affixed with the official seal;

(3) The original identity certificate of the legal representative and the copy of the identity card, which shall be affixed with the official seal;

(4) The original of the power of attorney, which shall indicate the name of the project, the name of the contact person, the telephone number, the e-mail address and other information, as well as the copy of the identity card of the authorized principal, and affix the official seal. (If any)

(5) Original ID card of the authorized client.

4. The electronic bidding documents shall be sent to the e-mail address registered on site. The price of each set of bidding documents is 500 yuan/set, which is non-refundable after sale.

Note: ① If the information provided is incomplete or does not meet the requirements, the bidding documents will be refused;

② Our company only accepts the registration and does not examine the qualifications of bidders. Whether the bidders meet the qualification requirements of this project shall be subject to the results of the review by the Bid Evaluation Committee. 4.

4.5 Question-raising method: all potential bidders are requested to edit the question-raising email (please indicate the project name) and send it to the email address: zbgs6b@126.4

.

All can be viewed after purchase
Correlation

The designed total installed capacity of this project is kW 204679, and the standard power generation is 10,000 kWh/year 25779.

2023-07-26 09:34:37

From September 22, 2025 to September 28, 2025, the highest opening rate of cement kilns in all provinces in China is Tianjin, with the opening rate of 100.00%. Kiln opening rate of 50% and above: 66.72% in Anhui Province, 61.98% in Shandong Province, 59.02% in Henan Province, 56.68% in Jiangsu Province, 50.00% in Liaoning Province and 50.00% in Hainan Province.