[Video] Guangdong Mine Successfully Sold 62.58 Million, can This Win Return the Cost?

2023-03-31 16:23:08

To be sold for 13.5 years, the starting price is 61.58 million yuan, and Luoding Hangye Building Materials Co., Ltd. is 62.58 million yuan, with a premium of 1 million yuan.

On March 20, the mining right of limestone mine for construction in Sanzuofo Mining Area, Jinji Town, Luoding City, Guangdong Province was successfully sold for 13.5 years, with a starting price of 61.58 million yuan. Luoding Hangye Building Materials Co., Ltd. won it for 62.58 million yuan, with a premium of 1 million yuan. The mining area of the

project is 0.1376 square kilometers, the resources transferred by the mining right are 5.821 million cubic meters, and the comprehensive utilization of stripping materials is 0.27 million cubic meters.

All can be viewed after purchase
Correlation

The designed production scale is 4 million m3/year of granite for construction. The calculation period for the current appraisal is 19.29 years, including 2 years of construction period.

2023-04-23 09:07:44

The mining area of the project is 0.3692 square kilometers, with 1.9096 million cubic meters of granite blocks for decoration, 8.7679 million cubic meters of granite for construction and 1.563 million cubic meters of sand for comprehensive utilization.

2023-04-21 15:02:55

To be sold for 13.5 years, the starting price is 61.58 million yuan, and Luoding Hangye Building Materials Co., Ltd. is 62.58 million yuan, with a premium of 1 million yuan.

2023-03-31 16:23:08

The mining right of granite mine for construction in Yangkeng Mining Area, Xiatai Town, Yingde City, Guangdong Province is to be sold for 24 years (including capital construction period), with an annual output of 4 million square meters and an initial price of 1.05 billion yuan.

2023-03-20 16:59:11

To be sold for 19 years, the initial price of listing is 34 million yuan, and Huihe Investment Co., Ltd. of Suixi County takes it for 34.5 million yuan, with a premium of 500000 yuan.

2023-03-07 14:41:49

The mining area of the project is 0.1376 square kilometers, with 5.821 million cubic meters of ore reserves transferred and 270 thousand cubic meters of stripping materials comprehensively utilized.

2023-02-06 15:03:43

From September 22, 2025 to September 28, 2025, the highest opening rate of cement kilns in all provinces in China is Tianjin, with the opening rate of 100.00%. Kiln opening rate of 50% and above: 66.72% in Anhui Province, 61.98% in Shandong Province, 59.02% in Henan Province, 56.68% in Jiangsu Province, 50.00% in Liaoning Province and 50.00% in Hainan Province.