Recently, according to a trading platform, a cement enterprise in Xinjiang has a daily output of 3200 tons of clinker production line, crushing production line, waste heat power generation system and other overall demolition and sale, with a starting price of 20 million yuan.
Sales scope: the east side to the dormitory building, the southeast side to the warehouse, the southwest side to the limestone hammering, the west side to the water treatment and coal storage shed, the north side to the clinker warehouse, and all the equipment and facilities, power distribution cables, buildings, waste heat power generation systems, etc. in the area are within the disposal scope.
Reserved scope: dormitory building, warehouse, air compressor room, two air compressors, generator, north of clinker warehouse (including clinker warehouse).