News List

Responsibilities: Be responsible for the daily management of the information business technology of the group headquarters, solve the technical problems of IT software and hardware; supervise the selection and implementation of the information system, integrate the three flows (information flow, logistics and capital flow), improve the management efficiency; guide the secondary enterprises to complete the business process reengineering and the construction of the intelligent factory, and use the information management technology to improve the decision-making and implementation system.

2024-10-18

Data show that the national cement output from January to September 2023 is 1495.21 million tons, so the absolute value of cement output from January to September this year is 16851 million tons less than same period last year, a decrease of 11.27%.

2024-10-18

It is understood that the technical renovation project of Real Madrid Cement 4600t/d new dry cement clinker production line and waste heat power generation is to upgrade the original 2500t/d new dry clinker production line to 4600t/d new dry clinker production line by using the existing raw material and raw coal treatment system and adopting the second-generation intelligent new dry pre-decomposition production process. It is equipped with 9 MW pure low-temperature waste heat power generation unit.

2024-10-18

From October 7, 2024 to October 13, 2024, the highest opening rate of cement kilns in all provinces in China was 82.86% in Hubei Province. Kiln opening rate of 50% and above: 79.02% in Henan Province, 67.42% in Anhui Province, 62.86% in Shanxi Province, 54.29% in Hebei Province, 52.86% in Shaanxi Province and 50.65% in Jiangsu Province.

2024-10-18

In general, if the alternative fuel is mainly domestic waste or general industrial combustible waste, when the substitution ratio is high, it may bring more alkali content to the clinker, thus causing the 28-day strength of the clinker to decrease. Because the calorific value, combustion rate and feeding rate of alternative fuels fluctuate greatly, the output and quality of clinker will also increase.

2024-10-18

Recently, the Ministry of Ecology and Environment issued the Notice on Further Deepening the Reform of Environmental Impact Assessment (hereinafter referred to as the Notice). Beijing, Hebei, Jilin, Fujian, Guangdong, Sichuan and Shaanxi respectively select two typical prefecture-level cities (or districts of municipalities directly under the Central Government) to carry out pilot work, taking into account the level of economic development and environmental management. Among them, it is clearly mentioned in the "industry categories that can optimize the classification management of environmental impact assessment" that the environmental impact assessment of cement grinding stations should be cancelled.

2024-10-17

Recently, the Department of Agriculture and Rural Areas of Anhui Province released the list of digital agricultural factories (farms, pastures, fishing grounds) in Anhui Province in 2024, and the Conch Tomato Digital Agricultural Factory of Baimashan Cement Plant was successfully selected.

2024-10-17

Enterprises also need to understand the operation process of the carbon emission trading market, including the declaration, verification and reporting of carbon emission data, the allocation, trading and clearance of quotas, especially the accuracy of carbon emission data will directly affect the quota allocation and transaction costs of enterprises. Enterprises also need to pay attention to the dynamics and trends of the carbon emissions trading market, understand the market price fluctuations, trading activity and other information, in order to formulate reasonable trading strategies and risk management measures.

2024-10-17

The Symposium on High-quality Development of Liaoji Heimeng Cement Industry, sponsored by Liaoning Building Materials Industry Association and hosted by the Northeast Operating Zone of Shanshui Group, was held in Shenyang from October 12 to 13, 2024. Nearly 300 people from more than 200 cement enterprises in Liaoning, Jilin, Heilongjiang and Inner Mongolia attended the meeting.

2024-10-17

Through field inspection and acceptance, Meizhou Real Madrid Cement Co., Ltd. has shut down and dismantled a cement clinker production line with a capacity of 2500t/d located in Beifang Village, Xinpu Town, Jiaoling County, Meizhou City, Guangdong Province; Yingde Yingma Cement Co., Ltd. has shut down and dismantled a cement clinker production line with a capacity of 600t/d located in Fuyang 2nd Road, Yingcheng Town, Yingde City, Qingyuan City, Guangdong Province. The above two production lines are no longer qualified for production.

2024-10-17

According to the announcement, Guangdong Qingyuan Guangying Cement Co., Ltd. will merge the existing cement clinker production line with a daily output of 2500 tons (Φ4.0 * 60 meters) with the cement clinker production line with a daily output of 4000 tons (Φ4.8 * 72 meters) in the same plant to build a 6500t/d clinker production line, and the total capacity will remain unchanged after the merger.

2024-10-17

Sichuan Shuangma announced on October 16 that on October 14, October 15 and October 16, 2024, the cumulative deviation of closing prices for three consecutive trading days was more than 20%, which belonged to abnormal fluctuations in stock trading. After verification, the company's recent business situation and internal and external business environment have not changed significantly. At present, the Company is planning a cash acquisition of equity, the transaction is still in the planning stage, there are uncertainties, the specific transaction plan to be further demonstrated and negotiated, the parties have not yet signed the relevant agreement, the Company will fulfill the obligation of information disclosure in a timely manner according to the progress of the transaction.

2024-10-17

China Tianrui Cement (01252. HK) announced that Mr. Chen Kun has tendered a resignation letter to resign as a joint company secretary and an authorised representative of the Company. Following the resignation of Mr. Chan, Ms. Lui Mei Ka has been appointed as the Joint Company Secretary and the Authorised Representative with effect from 16 October 2024. According to the database of listed companies, Ms. Lei Meijia graduated from the Chinese University of Hong Kong with a bachelor's degree in business administration and is now a member of the Hong Kong Institute of Certified Public Accountants.

2024-10-17

The 9.5 million tons/year aggregate project collapsed, resulting in 3 deaths and 2 injuries.

2024-10-17

On October 16, Gezhouba Cement held a briefing on production and operation in the first three quarters of 2024, summarized and analyzed the production and operation work in the first three quarters, and arranged for the deployment of key work in the fourth quarter. Gui Tongsheng, secretary of the Party Committee and chairman of the board of directors of the company, attended the meeting and made a speech. Yang Dan, deputy secretary of the Party Committee and general manager of the company, presided over the meeting.

2024-10-17

When the dragon comes out of the mountains, the natural moat becomes a thoroughfare. At present, a number of high-speed (inter-city) railways, such as Hefei-Xinyi, Chaohu-Ma'anshan, Fuyang-Mengcheng-Suzhou, Huaibei-Suzhou-Bengbu, are in full swing. We look forward to speeding up the development of "Anhui on the track" and drawing a better "poem and distance".

2024-10-16

Every employee should know what emission sources are available in his position, what emission reduction measures are available, and how much emission reduction can be achieved by these measures, so that they can understand the principle of emission, learn the method of accounting, use the carbon management platform, and improve the carbon management ability of each position, so as to achieve "carbon management in the whole process".

2024-10-16

The plan shows that Guizhou Duyun Haolong Cement sold 3333t/d of clinker production capacity for Ningxia Haolong Building Material Production Line, with replacement capacity of 1500t/d and replacement ratio of 2.222: 1.

2024-10-16

According to the statistics of China Cement Network Cement Big Data Research Institute, five clinker production lines are expected to be ignited and put into operation this year, with a total capacity of 6.82 million tons (calculated in 310 days).