On August 29, the tender announcement for PC contracting project of 150000 kilowatt beach photovoltaic power generation project (photovoltaic field and collector line) in Tongzhou Bay of Zhejiang Oilfield was issued, and the tenderer was CNPC Jiangsu Nantong New Energy Co., Ltd . The
bidding content shows that the project is located in the jellyfish breeding area of Tongzhou Bay Demonstration Zone, Nantong City, Jiangsu Province (breeding Huajia, jellyfish, fish, crab, etc.), and the sea area of the project is about 2,271 mu. The new DC side capacity of the project is 179.26 MWp, the AC side capacity is 149.76 MW, and the capacity ratio is about 1.2. The project uses 248,976 720Wp monocrystalline double-sided modules, of which photovoltaic modules and inverters are provided by the Employer.
This tender is for the photovoltaic field and collector line project, covering all the work from construction to grid-connected power generation and passing the completion acceptance. The details are as follows:
As for the bidding qualification, in addition to good reputation and relevant qualifications, the bidder's performance is from January 1, 2022 to the deadline for bidding. The bidder shall have at least one EPC general contracting or construction general contracting performance of 100MW and above photovoltaic grid-connected power generation project. Consortium bidding is not accepted for
this project . The deadline for bid
opening/bidding is 8:30 on September 19, 2025.