29 July, China Huaneng Group released Pingxiang Distribution and Anyuan Distribution (Phase III) " of Fengcheng New Energy Company of Huaneng Jiangxi Branch. The project includes Pingxiang Distributed Photovoltaic Project and Anyuan Distributed Photovoltaic Project (Phase III), both of which are located in the Economic Development Zone of Pingxiang City, Jiangxi Province, and will use the roofs of industrial and commercial buildings to construct ". The installed capacity of Pingxiang Distributed Photovoltaic Project is about 3MW , and the installed capacity of Anyuan Distributed Photovoltaic Project (Phase III) is about 2MW . The specific bidding scope is shown in the following figure:
In addition, this tender has performance requirements for bidders." In case of independent bidding, the bidder has been bidding since January 1, 2022. With at least 2 " In the case of a consortium bid , Since January 1, 2022, at least one distributed project design performance (excluding household use) of not less than 2MW has been completed by the consortium member design unit, and at least two photovoltaic projects have been completed or under construction by the construction unit . At least one of them is a distributed project not less than 2MW (excluding household use). Consortium bidding is accepted for
this project . In case of consortium bidding, there shall be no more than two members of the consortium, and the leading unit of the consortium shall be borne by the construction unit.The bid
closing/opening time is 9:00 on August 19, 2025.