Sinoma Luoding Cement won the mining right of a limestone mine for cement in Luoding, Guangdong for 74.782 million yuan

2024-08-16 15:26:18

On August 13, Sinoma Luoding Cement Co., Ltd. won the mining right of cement limestone mine in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province for 74.782 million yuan, with a starting price of 74.782 million yuan. The project is planned to be transferred for 13 years, with a mining area of 0.256 square kilometers and a transferred resource of 37.0208 million tons (including 26.7702 million tons of limestone ore for cement and 10.2506 million tons of interlayer).

On August 13, Sinoma Luoding Cement Co., Ltd. won the mining right of cement limestone mine in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province for 74.782 million yuan, with a starting price of 74.782 million yuan.

The project is planned to be transferred for 13 years, with a mining area of 0.256 square kilometers and a transferred resource of 37.0208 million tons (including 26.7702 million tons of limestone ore for cement and 10.2506 million tons of interlayer). Details

are as follows:

Announcement of Transaction Results of Limestone Mining Right Transfer for Cement in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province (YZZKJGZ [2024] No.1)

1.

Name of bidder: Sinoma Luoding Cement Co., Ltd.

Place: Dunzi Village, Pingtang Town, Luoding City

Unified Social Credit Code: 91445381669818314 K

2. Venue

: August 13

, 2024 Venue: Yunfu Public Resources Trading Center (Yunfu Public Resources Trading Service Platform)

III. Basic Information

of Mining Right Transaction Project Name: Limestone

Mine for Cement in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province Mineral Type: Limestone for Cement.

Geographical location: the mining area is located in the direction of 89 ° in the urban area of Luoding City, Guangdong Province, with a straight distance of about 18 kilometers. The central geographical coordinates are 111 ° 46 ′ 31.03 ″ east longitude and 22 ° 45 ′ 16.51 ″ north latitude. It is under the jurisdiction of Pingtang Town, Luoding City.

Mining area: 0.256 square kilometers. The coordinates of the inflection point of the mining area are as follows (2000 National Geodetic Coordinate System):

Resource reserves: The transferred resources are 37.0208 million tons (including 26.7702 million tons of limestone ore for cement and 10.2506 million tons of interlayer).

Mining elevation: + 291.3m to + 140m

Resource development and utilization: The Mineral Resources Development and Utilization Plan for the mining right has been issued by an institution with corresponding qualifications and reviewed by the competent department. The mining reserve of limestone for cement determined in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province is 37.0208 million tons (including 26.7702 million tons of limestone for cement and 10.2506 million tons of interlayer). During the development and utilization of the mine (including the capital construction period and the pit closure period), the development and construction shall be carried out in accordance with the Plan for the Development and Utilization of Limestone Resources for Cement in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province. Requirements for

mine geological environment protection and land reclamation: The mining right bidder shall prepare the Plan for Mine Geological Environment Protection and Land Reclamation in accordance with the principle of "who mines, who governs", adhere to the principle of "mining, greening, harnessing and reclamation at the same time", and fulfill the obligations of mine geological environment restoration and land reclamation. Term of

transfer: 13 years

Starting price: RMB seventy-four million seven hundred and eighty-two thousand yuan (¥: 74.782 million yuan)

IV. Transaction price and payment time of mining right

Transaction price: RMB seventy-four million seven hundred and eighty-two thousand (¥: 74.782 million)

Time of payment: The proceeds from the transfer of the mining right shall be paid by the mining right bidder in accordance with the provisions of the Measures for the Collection of Proceeds from the Transfer of Mining Rights (Cai Zong [2023] No.10) and the provisions of the Mining Right Transfer Contract. Method of

payment: payment shall be made in accordance with the provisions of the Measures for Collection of Mining Right Transfer Income (Cai Zong [2023] No.10) and the provisions of the Mining Right Transfer Contract.

5. Time limit

for applying for mining registration Within 8 months after signing the Mining Right Transfer Contract, the mining right bidder shall, in accordance with the relevant provisions of the State, prepare relevant materials by himself and apply to Yunfu Natural Resources Bureau for the Mining License.

6. Ways and means

of raising objections to the publicity contents Publicity time: August 16, 2024 to August 29, 2024. The basic information of the

transaction project has been published in the announcement of online listing and transfer of the mining right of cement limestone mine in Lingjiaotang Mining Area, Pingtang Town, Luoding City, Guangdong Province, and will not be explained in the announcement. All sectors of society are expected to supervise the above. If there is any objection to the publicity content, please submit it in writing to Yunfu Natural Resources Bureau (Tel: 0766-8936660, Address: Land Exchange Center Building, Century Avenue, Yuncheng District, Yunfu City, Guangdong Province).

This announcement is published simultaneously on the portal website of Yunfu Natural Resources Bureau and Yunfu Public Resources Trading Service Platform.

Yunfu Natural Resources Bureau

August 15

, 2024
All can be viewed after purchase
Correlation

Recently, the local weather conditions in China are not good, the recovery of market demand is insufficient, the price of concrete is mainly stable, and the local pressure is falling. From September 12 to September 18, the national concrete price index closed at 112.93 points, down 0.21% annually and 10.83% year-on-year.