"Our project mainly produces photovoltaic pipe piles and has been put into production ." Wang Jianfei, general manager of Ordos Jiuyao New Materials Co., Ltd. and President of Hubei Ordos Chamber of Commerce, said.
It is understood that on April 16, Hubei Jiuyao Electric Power Engineering Co., Ltd. and member enterprises of Hubei Ordos Chamber of Commerce jointly invested 120 million yuan in the construction of a project with an annual output of 5 million meters of prestressed concrete photovoltaic pipe piles, which was launched on April 27 and put into operation in October.
The project includes one standardized experiment building, two production workshops, two storage workshops, two PHC pipe pile production lines and supporting equipment, 8000 square meters of finished product yard, supporting construction of public works, auxiliary facilities and office buildings. The project is divided into two phases. The first phase is to build a PHC photovoltaic pipe pile with an annual output of 2.5 million meters. After completion, the annual output value will be 250 million yuan, the tax will be 25 million yuan, and more than 100 jobs will be provided for the local people.