On October 31, the Electric Power Reliability Management and Engineering Quality Supervision Center of the State Energy Administration issued the Briefing on the Work of Electric Power Quality Supervision in September 2023. According to the briefing, the typical quality supervision problems found are: the design change of a 2 * 400 MW thermal power generation project is not standardized; the pore-forming quality of the photovoltaic support foundation of a 50 MW photovoltaic power generation project is not up to the standard; the qualification certificate of the inspection personnel of a 220 kV outgoing line project is missing.
The original text is as follows:
Briefing
on the Work of Electric Power Quality Supervision in September 2023 In September 2023, 1166 electric power construction projects above a certain scale were supervised and inspected by various electric power quality supervision organizations, and 39105 problems were found. Among them, quality behavior problems are 22143, entity quality problems are 16962, and closed-loop 18103 have been completed in the same month. In September 2023, 481 new projects above a certain scale were registered, including 318 power grid projects and 163 power supply projects. The typical quality supervision problems
found are as follows: the design change of a 2 * 400 MW thermal power generation project is not standardized; the pore-forming quality of the photovoltaic support foundation of a 50 MW photovoltaic power generation project is not up to the standard; the qualification certificate of the inspection personnel of a 220 kV transmission line project is missing.