Recently, China Energy Construction International Group and ISOC Energy Company of the Philippines signed the EPC contract agreement for the 1G W floating photovoltaic project in Laguna Lake of the Philippines, which realized the rolling development of the clean energy market in the Philippines and accelerated the realization of the goal of green energy transformation in the Philippines.
The project is located in Laguna Lake in the Luzon, the largest lake in the Philippines, near Manila, the capital of the Philippines. The content of the project is the design, procurement, construction, testing and commissioning of the floating photovoltaic power station with an installed capacity of 1G W.
According to the Philippine Energy Plan, the proportion of renewable energy in the Philippines will increase to 35% in 2030 and 50% in 2040. As the world's leading provider of integrated solutions for energy, power and infrastructure, China Nengjian adheres to the concept of "owners have needs, Nengjian has advantages, both sides have consensus and win-win cooperation", and actively lays out the Philippine floating photovoltaic project and other renewable energy markets. After the completion of the project, it will become the first super-large-scale floating photovoltaic project in the Philippines, further enhance the proportion of green electricity in the Philippines, and promote the sustainable development of local social economy. The signing ceremony was attended by the head of the Southeast Asia Regional Headquarters of
China Nengjian International Group and the Philippine Branch.