Jinko Technology: Intends to invest RMB 2.3 billion in the construction of 400 MW photovoltaic power generation project in Saudi Arabia

2023-09-21 09:30:08

The total investment is about 315 million US dollars, equivalent to RMB 2.3 billion.

On the evening of September

20, Jingke Technologies announced that the company intends to invest in the construction of 400 MW photovoltaic power generation projects in Saudi Arabia, with a total investment of about 315 million US dollars, equivalent to RMB 2.3 billion.

The announcement pointed out that the project is a public bidding project of the Saudi government. Jinko Power (HK) Company Limited ( "Jinko HK"), a wholly-owned subsidiary of Jinko Power Technology Co., Ltd. (The "Company"), The consortium composed of Sun Glare Holding Co. Ltd. And Sunlight Energy Holding Co. Ltd. Won the bid with the first bid price (LCOE).

At present, the Company has not signed a formal power purchase and sale agreement with the power purchaser, and has not formally obtained the right to invest and operate the project; the project involves cross-border investment, and the Company needs to complete the relevant approval or filing procedures of the competent government departments such as the Department of Commerce of Jiangxi Province, the Development and Reform Commission and the State Administration of Foreign Exchange; Prior to the commencement of this project, it is necessary to obtain the development approval and construction permit from the corresponding local authorities in Saudi Arabia. According to

the data, the project is located in Al-Jouf area, about 17 kilometers northwest of Tabarjal City in the north of Saudi Arabia, which is a desert area with long sunshine time and abundant light resources. Saudi Arabia's 400MW project adopts the "build-own-operate" (BOO) mode, with an actual construction scale of 450MWp, a construction period of 21 months and an operation period of 30 years.


All can be viewed after purchase
Correlation

One has been established for five years and one for 17 years.

2026-09-07 09:17:48

What is happening in the cement industry?

2026-09-06 07:02:03

Some second and third-tier enterprises have taken the lead in reducing prices slightly.

2026-09-04 16:36:43

Domestic concrete price statistics in August showed that the national concrete price fell by 1.16% annually and 6.51% year-on-year. Prices in most areas have changed to varying degrees. On a month-on-month basis, prices in some regions changed significantly, such as Shanghai and Sichuan, where the decline was relatively large, while prices in Beijing, Shanxi and Inner Mongolia remained unchanged on a month-on-month basis. On a year-on-year basis, the decline in Jilin is relatively prominent, while Shanxi has a small increase over the same period. Overall, the domestic concrete price showed a certain fluctuation trend in August.

2026-09-01 11:18:22

The proportion of photovoltaic power generation in the electricity consumption of the whole society has reached 13%, and more than one kilowatt-hour of electricity used in the whole country comes from photovoltaic power.

2026-09-01 11:12:19

For the first time, the installed capacity of photovoltaic power generation exceeded that of coal-fired power generation, making it the largest power supply category in China.

2026-09-01 10:48:28

Nandian (Chengmai) New Energy Technology Co., Ltd. is not the first time to be listed for transfer. According to the tracking of the Digital New Energy DataBM. Com, the target was listed on the Beijing Property Exchange on July 21, 2026, and the transfer base price at that time was 86.45 million yuan.

2026-08-26 11:36:03

From January to July this year, the newly installed photovoltaic capacity in China was 86.15GW, down 61.41% from the same period last year.

2026-08-25 11:39:44

Dongfang Tiansuan signed a cooperation agreement with the State Inspection Group, and the two sides will jointly build a "Space Photovoltaic Joint Laboratory" to carry out joint research on space photovoltaic materials, satellite-borne photovoltaic cells/components, space environment reliability, testing methods, standard system and on-orbit verification.

2026-08-22 16:19:40

The shortage of transformers is becoming the hidden ceiling of new energy grid connection. For the photovoltaic industry, the lag of grid infrastructure has been the biggest obstacle to consumption; when the grid investment is really accelerated, the grid-connected space of new energy such as photovoltaic will also be opened.

2026-08-21 13:07:15

In the third quarter, the grid-connected capacity of distributed photovoltaic in all counties (cities and districts) of Guangdong Province was 24.210 GW.

2026-08-20 13:05:01

Seven manufacturers, including Jingke Energy, Trina Solar Energy, Jingao Technology, Atlas, Dongfang Risheng, Yingli Energy and Runma Solar Energy, raised their component quotations by 0.01-0.03 yuan/W.

2026-08-12 17:50:55

On July 29, Longji Green Energy released the pre-approval announcement of the environmental impact assessment of the new crystalline silicon-perovskite tandem solar cell technology and equipment industrialization project and the new high-efficiency back contact (BC) cell technology and equipment project of Xixian New Area Branch.

2026-08-12 16:36:35

It is worth noting that the meeting not only formed a consensus on self-discipline among enterprises, but also put forward a series of supporting disciplinary measures and suggestions:

2026-08-07 14:24:19

On July 30, the Hunan Development and Reform Commission held the second comprehensive roadshow of major projects in the province in 2026. Among them, Yanhe Intelligent Perovskite New Material Production Line Project was unveiled.

2026-08-06 09:07:52

Although the quotation side continues to weaken, the demand side of the distributed market has shown a phased recovery.

2026-08-05 15:52:42

The Plan rationally arranges the construction scale of various power sources, power grids and regulating resources, and optimizes the technical routes and spatial layout of pumped storage and new energy storage. By 2030, the installed capacity of new energy storage will reach 300 million kilowatts, and the interaction between vehicles and networks will strive to reach about 50 million kilowatts, so as to reduce the cost of power system transformation and the cost of electricity consumption in the whole society.

2026-08-05 10:21:33